Version without filler pipe:

Oil filler pipe is omitted as of 1.91.

ATF (refer to BMW Operating Fluids) is poured in through the filler
bore underneath the oil sump.

Unscrew the filler screw plug (1).

Installation:

Check seal; replace if necessary.

Car must be stationary on a level surface.

With the engine is not running, pour in ATF using the filler neck (2)
(refer to BMW Parts) until ATF runs out of overflow hole.

Do not seal aperture.

Start engine and shift through all gears, operating brake at same
time.

Increase ATF temperature to 30 ... 55 

°

C.

Interrogate with MoDiC or Service Tester (refer to Test Plan)

Run engine at idle speed in selector lever setting "P" or "N".

Check ATF level again.

Screw in and tighten filler plug.

Tightening Torque, refer to Technical Data 24 11 7AZ

RA  Removing and installing/sealing or transmission oil sump

BMW AG - TIS

23.01.2013  07:19

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

3 RA Removing And Installing_sealing Transmission Extension (A4S 270R_ 310R) > < 2 RA Removing And Installing_sealing Or Transmission Oil Sump|Page 700