CTS V8-5.7L VIN P (2004)
Tighten the screw to 9.8 N.m (87 lb in).
10. Install the A/C quick connect clamp on the line.
11. Gently tug on the liquid line to ensure that the clamp (2) is engaged.
12. Connect the high pressure switch electrical connector (1) to the switch (2).
13. Install the air cleaner assembly.
14. Install the battery.
15. Evacuate and recharge the refrigerant system.
16. Leak test the fittings of the repaired or reinstalled component using the J 39400-A.