Removing - Refitting: Integral intake system
- Make
- Citroën
- Model
- C5 (X7) Factory Workshop Manual
- Year
- 2008–2017
- Section
- Cylinder head › Removing - Refitting: Integral intake system
Removing - Refitting: Integral intake system
ESSENTIAL: Observe the safety and cleanliness recommendations.
CAUTION: Before disconnecting the battery, partially open the door windows.
ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir: Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.
1. Tooling
Necessary equipment: workshop hoist.
| Tools | Reference | Designation |
|---|---|---|
| [0195-P] | lifting brackets |
| [0172-Z] | Pliers for removing CLIC clips |
| [0194-T] | Set of plugs |
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
N.B.: After switching off the ignition, wait 15 minutes before disconnecting the battery (To ensure that the learning patterns of the various ECUs are stored in memory).
Disconnect the battery negative terminal.
Keep the luggage compartment lid open.
Remove:
- The injectors
- The fuel high pressure common injection rails
- The supports for the fuel high pressure common injection rails (Front and rear)
- The accessories drive belt
Remove:
- The injectors
- The fuel high pressure common injection rails
- The supports for the fuel high pressure common injection rails (Front and rear)
- The accessories drive belt
CAUTION: Blank all of the fuel circuit openings which are open; Using tool [0194-T].
Remove:
- The air union (1)
- The air inlet box (2)
- The pipes (3)
- The fuel pipes (4)
- The bracket (5)
Remove bolts (6).
Release: The cooling hoses (7), (8), (9).
Remove: The fixing clip (10).
Remove: The electrovalve (11) with its support.
Unscrew: The timing covers fixing bolts (12), (13).
Fit the tool [0195-P].
Tighten the securing bolts to 2,2 dan.m.
Support the engine; Using a workshop crane.
Remove:
- The engine mounting assembly (14)
- The timing housings (12), (13)
Refit: The engine mounting assembly (14).
Remove:
- The vacuum circuit pipes (15)
- The EGR valve hoses (16), (17); Using tool [0172-Z]
Disconnect and move aside the electric harness (18) (Integral intake system).
Release: The fuel return pipes.
Remove: The air mixer unit (19) (In the order shown):
- Pivot the air mixer unit (At "A")
- Engage: The air mixer unit (At "B")
Remove the cylinder head covers (20), (21).
CAUTION: Clean the gasket faces with an approved descaling product. Do not use a cutting or abrasive tool. The gasket faces must not have any traces of knocks or scores.
3. Refitting
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Adhere to the tightening torques:
CAUTION: At refitting, all the removed seals must be replaced with new seals.
CAUTION: Clean the gasket faces with an approved descaling product. Do not use a cutting or abrasive tool. The gasket faces must not have any traces of knocks or scores.
Replace:
- The seals (Cylinder head cover)
- The EGR pipes fixing clamps
Refit:
- The cylinder head covers (20), (21)
- The air mixer unit (19)
Reposition and connect:
- The fuel return pipes
- The electrical harness (18) (Integral intake system)
Refit:
- The EGR valve hoses (16), (17); Using tool [0172-Z]
- The vacuum circuit pipes (15)
Support the engine; Using a workshop crane.
Remove: The engine mounting assembly (14).
Refit:
- The timing housings (12), (13)
- The engine mounting assembly (14)
Withdraw the workshop lift.
Remove the tool [0195-P].
Refit:
- The electrovalve (11) with its support
- The fixing clip (10)
Position: The cooling hoses (7), (8), (9).
Refit:
- The (6) bolt
- The bracket (5)
- The fuel pipes (4)
- The pipes (3)
- The air inlet box (2)
- The air union (1)
Refit:
- The accessories drive belt
- The supports for the fuel high pressure common injection rails (Front and rear)
- The fuel high pressure common injection rails
- The injectors
Refit:
- The accessories drive belt
- The supports for the fuel high pressure common injection rails (Front and rear)
- The fuel high pressure common injection rails
- The injectors
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Reconnect the battery.
Parts & tools for this job For 2008 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2008 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.