Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën C6 Factory Workshop Manual (2005-2012)01 · Engine
01 · Engine

Removing - refitting: Coolant pump (ES9A)

Make
Citroën
Model
C6 Factory Workshop Manual
Year
2005–2012
Section
Cooling system › Removing - refitting: Coolant pump (ES9A)
EngineRemoving - refitting: Coolant pump (ES9A)

Removing - refitting: Coolant pump (ES9A)

Citroën C6 · Removal-fitting · Ref. B1GG1EP0

Applies to: 3.0i V6 24V 211 (ES9A)

ESSENTIAL: Observe the safety and cleanliness recommendations.

CAUTION: Before disconnecting the battery, partially open the door windows.

1. Removing

Remove:

  • The engine cover
  • The battery style cover

Disconnect the battery.

Drain the cooling system (see the relevant operation).

Remove the timing belt (see the relevant operation).

Figure b1ep158d

Remove:

  • The (1) bolt
  • The tensioning roller
  • The bolts (2)
  • The engine mounting (3)
  • The bolts (4)
  • The dynamic tensioner (5)
Figure b1gp08fc

Remove:

  • The bolts (6)
  • The coolant pump (7)
  • The water pump seal

2. Refitting

ESSENTIAL: Always replace the coolant pump seal.

Figure b1gp08gc

Refit the coolant pump (7) using a new seal.

CAUTION: Follow the tightening sequence.

Tightening procedure:

  • Pre-tightening to 0,5 ± 0,1 daN.m
  • Tightening to 0,8 ± 0,1 daN.m

Refit:

  • The dynamic tensioner (5)
  • The bolts (4)
  • The engine mounting (3)
  • The bolts (2) Tighten to 6 ± 0,1 daN.m
  • The tensioning roller
  • The (1) bolt Tighten to 8 ± 0,1 daN.m

Refit the timing belt (see the relevant operation).

Fill and bleed the cooling system (see the relevant operation).

Reconnect the battery.

Refit:

  • The battery style cover
  • The engine cover

ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).

Parts & tools for this job For 2005 Citroën C6

As an Amazon Associate we earn from qualifying purchases.