Removing - refitting: Engine/gearbox assembly DT20C / AM6
- Make
- Citroën
- Model
- C6 Factory Workshop Manual
- Year
- 2005–2012
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly DT20C / AM6
Removing - refitting: Engine/gearbox assembly DT20C / AM6
ESSENTIAL: Observe the safety and cleanliness recommendations.
ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.
1. Tooling
Equipment: Lifting tool.
| Reference | Designation |
|---|---|
| [1] | A brake pedal depressor |
| Reference | Designation | Reference |
|---|---|---|
| [2] | Load balancer | Type FACOM DL.101 |
| Reference | Designation | Reference |
|---|---|---|
| [3] | lifting brackets | (-).0195-N |
2. Removal
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Disconnect the ancillaries battery.
Remove:
Remove:
- The exhaust pipe
- The front driveshafts
- The cooling radiator
Drain:
- The air conditioning system
- The cooling system
Uncouple the click-fit unions of the fuel supply and return pipes () (at "a").
Uncouple the pipe (1) from the expansion bottle.
CAUTION: Blank the air conditioning circuit hoses using plugs if any of its components are removed.
Unclip the pipe (as "c").
Remove the air conditioning pipes (2).
Uncouple the pipe (at "b").
Remove:
- The nut (5)
- The air conditioning pipe (3)
- The air conditioning capacitor (4)
Uncouple the pipe (6) from the power steering pump (at "d").
Move aside the pipe (6).
Unclip and release the hose (7) (at "e").
Disconnect the pipes (at "g", "j").
Unclip the pipe (as "f").
Uncouple and move aside the power steering hydraulic pipes (8) (at "h").
Disconnect the connectors (at "k", "m").
Unclip the electrical harness (at "n").
Remove the electric harness (9).
Remove:
- The bolts (11)
- The brackets (10) (Headlamps)
each side:
- Slacken the bolt (14)
- Remove the bolt (15)
- Remove the bolts (13)
- Remove the front crossmember (12)
Uncouple the ball-joint from the gear selection control cable (21) by pinching it (at "r").
Disengage the gear selection cable (21) from the sleeve stop (as "q").
Uncouple the snap-in union (as "p").
Remove:
- The (19) bolt
- The earth cable (18) bolt (20)
- The (16) bolt
- The pre-heater unit (17)
Remove:
- The bolts (23)
- The ECU support (22)
Unclip the electrical harness (at "s").
Disconnect and move aside the connectors (as "t").
Remove:
- The bolts (24)
- The engine relay unit support (25)
Unclip the electrical harness (at "u", "v").
Remove:
- The (26) bolt
- The nut (27)
Unclip the electrical harness (at "w").
Remove:
- The fixing bracket screw (29)
- The plastic cover (28)
Remove:
- The (30) bolt
- The (31) bolt (from underneath the vehicle)
Remove the fastener (33).
Place the front wheels in the straight ahead position and lock the steering wheel in this position; Using tool [1].
Uncouple the steering column (32) from the tail of the power steering valve (following the arrow).
Unplug:
- The connector (at "x")
- The connectors (at "y") (on each side)
Position:
- Tools [2] and [3]
- The lifting tool
CAUTION: Check the routing of the strap (at "z").
Strap all of the following components:
- ENGINE
- Gearbox
- Sub-frame
Remove (on each side):
- The bolts (34)
- The yoke (35)
Remove the screws (36) and (37) (on each side).
Remove:
- The vibration damper (38)
- The nut (39)
- The bolts (40)
- The right-hand engine mounting (41)
Remove the bolts (42) (Left engine mounting bracket (43)).
Balance all of the following components:
- ENGINE
- Gearbox
- Sub-frame; Using tool [2]
Remove the power unit assembly - Sub-frame (from underneath the vehicle).
ESSENTIAL: Place the engine-gearbox-subframe assembly on a lifting table without removing the lifting tool.
Uncouple:
- The click-on union (at "aa")
- The pipe (44)
Unclip the pipes () (as "ab").
Remove the bolt (45).
Remove:
- The bolts (47)
- The (48) bolt
Move aside the power steering pipe (46).
Unplug:
- The connector (at "ac")
- The connector (at "ad")
Unclip the electrical harness (at "ae").
Remove the bolt (49).
Remove the bolt (50).
Remove the strap ().
Remove the power unit assembly.
3. Refitting
CAUTION: Adhere to the tightening torques.
Tightening torques:
Relocate:
- The power unit assembly (on the engine subframe)
- The bolt (50)
- The bolt (49)
Strap all of the following components:
- ENGINE
- Gearbox
- Sub-frame
Clip the electrical harness (as "ae").
Connect:
- The connector (at "ad")
- The connector (at "ac")
Reposition the power steering pipe (46).
Relocate:
- The (48) bolt
- The bolt (47)
- The bolt (45)
Clip the pipes (at "ab").
Couple up:
- The pipe (44)
- The click-on union (at "aa")
CAUTION: Position the rack at the mid-point.
Offer up the engine-gearbox-subframe assembly in the engine compartment.
CAUTION: Screw in the bolts of the right-hand and left-hand engine mountings until they make contact, without tightening.
Relocate:
- The left-hand flexible engine mounting (42) bolts (43)
- The right-hand engine mounting (41)
- The bolts (40)
- The nut (39)
- The vibration damper (38)
Relocate (on each side):
- The bolts (36), (37)
- The yoke (35)
- The bolts (34)
Remove:
- The lifting tool
- The tool [2]
- The fixing strap
Connect:
- The connectors (at "y") (on each side)
- The connector (at "x")
CAUTION: It is imperative that the steering column fixing (33) is replaced.
Couple the steering column (32) to the tail of the power steering valve.
Relocate:
- The fixing (33)
- The (31) bolt (from underneath the vehicle)
- The (30) bolt
- The plastic cover (28)
- The fixing bracket screw (29)
Clip the electrical harness (as "w").
Relocate:
- The nut (27)
- The (26) bolt
Clip the electrical harness (as "u", "v").
Relocate:
- The bracket (25)
- The bolts (24)
Connect the connectors (at "t").
Clip the electrical harness (as "s").
Relocate:
- The ECU support (22)
- The bolts (23)
- The pre-heater unit (17)
- The (16) bolt
- The earth cable (18) bolt (20)
- The (19) bolt
Couple the clickfit union (as "p").
Engage the gear selector cable (21) in the cable stop "q".
Couple up the gearbox control cable (21) (at "r").
Relocate (each side):
- The front crossmember (12)
- The (15) bolt
- The bolts (13)
Tighten the bolt (14) (each side).
Relocate:
- The brackets (10) (Headlamps)
- The bolts (11)
- The electrical harness (9)
Clip the electrical harness (as "n").
Connect the connectors (at "k", "m").
Couple the power steering hydraulic pipes (8) (at "h").
Clip the hose () (as "f").
Join the hoses (at "g", "j").
Clip the hose (7) (at "e").
Couple the pipe (6) (Power steering pump) (at "d").
CAUTION: Always replace the seals and coat them with air conditioning compressor oil.
Relocate:
- The air conditioning capacitor (4)
- The air conditioning pipe (3)
- The nut (5)
Recouple the connection hose (at "b").
Fit the air conditioning pipes (2).
Clip the hose () (as "c").
CAUTION: Remove the protective plugs ().
Couple the pipe (1) (Expansion chamber).
Couple the click-fit unions (as "a").
Relocate:
Relocate:
- The cooling radiator
- The front driveshafts
- The exhaust pipe
Fill the air conditioning circuit.
Top up the power steering fluid level.
Fill and bleed the cooling system.
CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.
Reconnect the ancillaries battery.
Parts & tools for this job For 2005 Citroën C6
- PARTEngine gasket setSearch: Citroën C6 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.