Removing - refitting: Engine/gearbox assembly (DW12BTED4)
- Make
- Citroën
- Model
- C6 Factory Workshop Manual
- Year
- 2005–2012
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (DW12BTED4)
Removing - refitting: Engine/gearbox assembly (DW12BTED4)
ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.
ESSENTIAL: Observe the safety and cleanliness recommendations.
CAUTION: Before disconnecting the battery, partially open the door windows.
1. Recommended tools
[1] hub immobilising tool 6310-T.
[2] pliers for removing and refitting hose clips 9029-T.
[3] Lifting table with accessories 5702-T.A.
[4a] Engine mounting with reversible tool 5704-T.
[4b] engine support 5704-T.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Disconnect the battery.
Slacken the front wheel bolts.
Chock and raise the vehicle on a 2 column lift.
Drain:
- The engine cooling system (see the relevant operation)
- The gearbox (manual gearbox) (see the relevant operation)
Remove:
- The engine cover
- The ECU carrier cover (3)
Disconnect the battery.
Disconnect the connector (at "a").
Remove:
- The air duct (5)
- The air filter (4) with the air flow sensor
- The air duct (2)
Detach and move aside:
- The fuel supply pipe (8)
- The fuel return pipe (7)
- The cooling radiator venting hose (9)
- The venting hose on the cylinder head (1)
Remove the accessories drive belt (6) (see the relevant operation).
Remove:
- The brake servo tube (10)
- The engine management ECU (12)
Disconnect, unclip and move aside:
- The engine electrical harness (11)
- The electrical harness (15)
- The positive supply (at "b")
- The connector "c"
Detach and move aside:
- The pipe (16); Using tool [2]
- The pipe (17); Using tool [2]
- The heater matrix hoses ()
Move aside the engine compartment fusebox (14).
The ECU carrier (13).
Disconnect and move aside:
- The connector "d"
- The connector "e"
Detach and move aside:
- The gearbox control rods (19)
- The earth wire (22) on the gearbox (/)
- The clip (21)
- The clutch thrust bearing (20)
Remove:
- The dual turbocharger inlet () double air duct (18)
- The engine cooling radiator
Slacken the driveshafts; Using tool [1] (see the relevant operation).
Unplug:
- The connector (at "f")
- The connector (at "g")
Remove the 3 fixings (24) from the air conditioning compressor (23).
Suspend the air conditioning compressor (23) on the vehicle body.
Remove:
- The front wheels
- The engine subframe (see the relevant operation)
- The drive shafts (see the relevant operation)
- The turbocharging air cooler inlet and outlet air ducts
- The dual turbocharger under engine air outlet duct ()
CAUTION: Mark the particle filter differential pressure pipes before uncoupling them.
Uncouple:
- The particle filter differential pressure pipes
- The gear controls support
Remove:
- The exhaust clip
- The exhaust pipe and particle filter assembly () (see the relevant operation)
Place the vehicle at a height of 50 cm from the ground.
Centralise the lifting table 3 under the engine/gearbox assembly.
Lift the elevating platform [3].
Clamp the engine-gearbox assembly using tools [4a] and [4b].
N.B.: Position the tools [4b] in the recessed holes in the cylinder block (at "h").
Place the support [4a] in the right-hand drive shaft bearing.
Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.
Remove:
- The engine cooling radiator (see the relevant operation)
- The upper torque reaction link (25)
- The bolts (26)
- The nut (28)
- The right-hand engine mounting (27)
Remove:
- The bolts (30)
- The bolts (31)
- The engine mounting (32)
Slowly lower the engine and gearbox assembly; Using tool [3].
Remove the left hand engine mounting (29) and its fixing bolts.
Slowly lower the engine and gearbox assembly; Using the tools [3], [4a], [4b].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Manoevre the engine-gearbox assembly to facilitate removal.
Raise the vehicle.
Move aside the front splash shields (if necessary).
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Raise the vehicle.
Position:
- The lifting bench [3] under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Lift the elevating platform [3].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body. Manoevre the engine-gearbox assembly to facilitate its repositioning.
Engage the left hand engine mounting (29) and its fixing bolts.
Tighten the screws of the LH engine support (29) to 5,5 ± 0,5 m.daN.
Position the engine-gearbox assembly facing its upper fixings.
CAUTION: When refitting the engine-gearbox assembly, take weight on the supports (29) and (32) before tightening the screws (31).
Refit:
- The engine mounting (32)
- The bolts (30); Tighten to 6 ± 0,6 daN.m
- The bolts (31); Tighten to 5,5 ± 0,5 daN.m
- The engine mounting (27)
- The bolts (26); Tighten to 6 ± 0,5 daN.m
- The nut (28); Tighten to 4,5 ± 0,4 daN.m
- The upper torque reaction link (25)
Withdraw the lifting bench [3] from under the vehicle.
Refit:
- The exhaust pipe and particle filter assembly () (see the relevant operation)
- The exhaust clip; Tightening to 2,5 ± 0,2 daN.m
Couple up:
- The gear controls support
- The particle filter differential pressure pipes
Reposition the air conditioning compressor (24).
Refit the 3 air conditioning compressor (24) fixings (23).
Reconnect the connectors "f", "g".
Refit:
- The dual turbocharger under engine air outlet duct ()
- The turbocharging air cooler inlet and outlet air ducts
- The drive shafts (see the relevant operation)
- The engine subframe (see the relevant operation)
- The sound-deadening under the engine
- The front wheels
Reconnect the connectors "d", "e".
Refit:
- The ECU tray (13)
- The engine ecu (12)
Reposition the fusebox (14).
Unclamp, reposition and reconnect:
- The earth wire (22) on the gearbox (/)
- The engine electrical harness (11)
- The electrical harness (15)
Reconnect:
- The connector "c"
- The positive supply (at "b")
Refit the engine cooling radiator (see the relevant operation).
Reposition and couple:
- The pipe (16); Using tool [2]
- The pipe (17); Using tool [2]
- The clutch thrust bearing (20)
Refit:
- The clip (21)
- The dual turbocharger inlet () double air duct (18)
- The gearbox control rods (19)
- The heater matrix hoses ()
- The brake servo tube (10)
Refit the ancillary belt (6) (see the relevant operation).
Couple up:
- The venting hose on the cylinder head (1)
- The cooling radiator venting hose (9)
- The fuel return pipe (7)
- The fuel supply pipe (8)
Top up the oil in the gearbox (manual gearbox) (see the relevant operation).
Refit:
- The air duct (2)
- The air filter (4) with the air flow sensor
- The air duct (5)
Reconnect the connector (at "a").
Reconnect the battery.
Refit the cover on the ECU tray (3).
Fill and bleed the cooling system (see the relevant operation).
Perform the following operations:
- Check the brake fluid level
- Check the LDS fluid level
Refit the engine style cover.
Lower the vehicle to the ground.
Check the functioning of the air conditioning.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2005 Citroën C6
- PARTEngine gasket setSearch: Citroën C6 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.