Tightening torques: DT17TED4 engine
- Make
- Citroën
- Model
- C6 Factory Workshop Manual
- Year
- 2005–2012
- Section
- Engine assembly › Tightening torques: DT17TED4 engine
Tightening torques: DT17TED4 engine
1. Cylinder head
CAUTION: (*) Follow the tightening sequence.
| Reference | Designation | Tightening procedure |
|---|---|---|
| (1) | Butterfly housing | Tightening to 0,9 m.daN |
| (2) | Inlet valve cover screws (*) | Tightening to 0,9 m.daN |
| Inlet valve cover studs (*) | ||
| (3) | Coolant outlet housing | Tightening to 0,9 m.daN |
| (4) | Cylinder heads (*) | Pre-tighten to 2 daNm |
| Tightening to 4 m.daN | ||
| Tightening to 8 m.daN | ||
| Angular tightening to 180° | ||
| (5) | EGR (exhaust gas recycling) electrovalve | Tightening to 0,9 m.daN |
| (6) | nuts - Exhaust manifold | Tightening to 2,3 m.daN |
| studs - Exhaust manifold | Tightening to 1,3 m.daN | |
| (7) | nuts - turbocharger | Tightening to 2,3 m.daN |
| studs - turbocharger | Tightening to 1,3 m.daN | |
| (8) | Pre-catalysts | Tightening to 2 m.daN |
| (9) | vacuum pump | Tightening to 2,3 m.daN |
| - | Pre-heater plugs | Tightening to 1 m.daN |
| - | Knock sensors | Tightening to 2 m.daN |
1.1. Sequence of tightening of screws (2)
(2) bolts - Camshaft bearings covers (from 1 to 13).
(2) studs - Camshaft bearings covers (from 1 to 13).
1.2. Sequence of tightening of screws (4) (from 1 to 8)
(4) Cylinder head bolts.
2. Cylinder block
CAUTION: (*) Follow the tightening sequence.
| Reference | Designation | Tightening procedure |
|---|---|---|
| (10) | Water pump pulley | Tightening to 2,3 m.daN |
| (11) | Coolant pump | Tightening to 0,9 m.daN |
| (12) | Conrod screws | Pre-tighten to 2 daNm |
| Angular pre-tightening to 45° | ||
| Angular tightening to 45° | ||
| Closing plate fixing screws (Gearbox end) | Tightening to 0,9 m.daN | |
| Engine speed sensor | Tightening to 0,5 m.daN | |
| (13) | Starter gearwheel carrier | Pre-tighten to 5 daNm |
| Angular tightening to 90° | ||
| (14) | bolts - Engine sump (*) | Tightening to 0,9 m.daN |
| (15) | bolts - Engine sump (*) | Tightening to 2,3 m.daN |
| (16) | Bearing cap fixing screws (*) | Pre-tighten to 6 daNm |
| Tightening to 14,5 m.daN | ||
| Angular tightening to 90° | ||
| (17) | bolts - Crankshaft main bearing cap casing (*) | Pre-tighten to 1,5 daNm |
| Tightening to 3,3 m.daN | ||
| Angular tightening to 47° | ||
| (18) | Accessories drive pulley | Tightening to 2,5 m.daN |
2.1. Sequence of tightening of screws (14) and (15)
(14) bolts - Engine sump (screws M6).
(15) bolts - Engine sump (screws M8).
Tightening procedure:
- Tighten the 10 bolts (15) to 2,3 m.daN (from 1 to 10)
- Tighten the 8 bolts (14) to 0,9 m.daN (from 11 to 18)
2.2. Sequence of tightening of screws (16) and (17)
(16) Bearing cap fixing screws (screws M9).
(17) bolts - Crankshaft main bearing cap casing (screws M6).
Tightening procedure:
- Pre-tighten the 16 bolts (16) to 6 dan.m (from 1 to 16)
- Pre-tighten the 8 bolts (17) to 1,5 dan.m (from 17 to 24)
- Pre-tighten the 16 bolts (16) to 14,5 dan.m (from 1 to 16)
- Tighten the screws (16) by 90° (from 1 to 16)
- Tighten the 8 bolts (17) to 3,3 m.daN (from 17 to 24)
- Tighten the screws (17) by 47° (from 17 to 24)
3. Lubrication
| Reference | Designation | Tightening procedure |
|---|---|---|
| (19) | Oil filter cover | Tightening to 2,3 m.daN |
| (20) | Oil filter support | Tightening to 0,9 m.daN |
| (21) | coolant/oil heat exchanger | Tightening to 0,9 m.daN |
| (22) | Oil pressure switch | Tightening to 1,3 m.daN |
| (23) | Oil pump assembly | Tightening to 0,9 m.daN |
| (24) | dipstick | Tightening to 2,3 m.daN |
| (25) | Oil level sensor | Tightening to 2,7 m.daN |
| (26) | sump | Tightening to 0,9 m.daN |
| (27) | drain plug | Tightening to 2,3 m.daN |
| (28) | Oil suction strainer | Tightening to 0,9 m.daN |
| (29) | Piston skirt spray jets | Tightening to 1 m.daN |
| (30) | Turbocharger lubricating pipe | Tightening to 0,9 m.daN |
| (31) | Turbocharger lubricating pipe | Tightening to 1,3 m.daN |
4. Timing gear
| Reference | Designation | Tightening procedure |
|---|---|---|
| (32) | Camshaft pulley hub screws | Tightening to 8 m.daN |
| Angular tightening to 90° | ||
| (33) | bolts - Camshaft pulley | Tightening to 2,3 m.daN |
| (34) | Camshaft bearing caps (*) | Pre-tighten to 0,5 daNm |
| Tightening to 0,9 m.daN | ||
| (35) | Fuel high pressure pump drive pulley roller tensioner | Tightening to 2,5 m.daN |
| (36) | Fuel high pressure pump drive pulley | Tightening to 8 m.daN |
| Angular tightening to 90° | ||
| (37) | Camshaft timing chain tensioner | Tightening to 0,9 m.daN |
| (38) | Timing belt roller bearing | Tightening to 4,5 m.daN |
| (39) | Timing gear on crankshaft (Prior to engine no. V0364469V) | Tightening to 10 m.daN |
| Angular tightening to 90° | ||
| Timing gear on crankshaft (From engine number V0364469V) | Tightening to 30 m.daN | |
| Angular tightening to 90° | ||
| (40) | Timing belt tensioner roller | Tightening to 2,6 m.daN |
ESSENTIAL: The camshaft bearing caps are marked at "a" with a letter on the front cylinder head and a number on the rear cylinder head. Refit the camshaft bearing caps as in the diagram above.
Refit:
- The camshaft bearing caps (34) 9, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G and F
- The bolts (41)
Tightening of screws (41):
- Pre-tighten the screws (41) of the camshaft bearing caps (34) by hand, in the following sequence: 9, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G and F
- Pre-tighten the screws (41) of the camshaft bearing caps (34) to 0,5 m.daN, in the following sequence: 9, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G and F(41)(34)0,59, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G F(41)(34)0,59, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G F(41)(34)0,59, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G F(41)(34)0,59, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G F
- Tighten the screws (41) of the camshaft bearing caps (34) to 1 m.daN, in the following sequence: 9, 8, 7, 6, 4, 3, 2, D, C, B, A, J, G and F(41)(34)19, 8, 7, 6, 4, 3, 2, D, C, B, A, J, GF(41)(34)19, 8, 7, 6, 4, 3, 2, D, C, B, A, J, GF(41)(34)19, 8, 7, 6, 4, 3, 2, D, C, B, A, J, GF(41)(34)19, 8, 7, 6, 4, 3, 2, D, C, B, A, J, GF
Apply LOCTITE 518 sealing product on the camshaft bearing caps (15) K, 5, E and J (see procedure: remove-refit camshafts).
Refit the camshaft bearing caps K, 5, E and J.
Tightening of screws (41):
- Pre-tighten the screws (41) of the camshaft bearing caps (34) by hand, in the following sequence: K, 5, E and J
- Pre-tighten the screws (41) of the camshaft bearing caps (34) to 0,5 m.daN, in the following sequence: K, 5, E and J(41)(34)0,5K, 5, EJ(41)(34)0,5K, 5, EJ(41)(34)0,5K, 5, EJ(41)(34)0,5K, 5, EJ
- Tighten the screws (41) of the camshaft bearing caps (34) to 1 m.daN, in the following sequence: K, 5, E and J(41)(34)1K, 5, EJ(41)(34)1K, 5, EJ(41)(34)1K, 5, EJ(41)(34)1K, 5, EJ
5. Injection system
| Reference | Designation | Tightening procedure |
|---|---|---|
| (42) | Water diesel exchanger | Tightening to 2,2 m.daN |
| (43) | Diesel injection pump on support | Tightening to 2,3 m.daN |
| (44) | Diesel injection pump pinion | Tightening to 5 m.daN |
| (45) | Diesel injector fixing flange screw | Tightening to 0,9 m.daN |
| (46) | Connector on diesel injector | Pre-tighten to 1,5 daNm |
| Tightening to 2,3 m.daN | ||
| (47) | Fuel high pressure common injection rail on the engine block | Pre-tighten to 1,5 daNm |
| Tightening to 3 m.daN | ||
| (48) | Fuel high pressure common injection rail unions | Pre-tighten to 1,5 daNm |
| Tightening to 3 m.daN | ||
| (49) | Fuel filter support | Tightening to 2,3 m.daN |
| (50) | Connector on high pressure diesel pump | Pre-tighten to 1,5 daNm |
| Tightening to 3 m.daN | ||
| (51) | Fuel high pressure common injection intermediate rail | Pre-tighten to 1,5 daNm |
| Tightening to 3 m.daN |
6. Alternator - air conditioning compressor - Power steering pump
| Reference | Designation | Tightening procedure |
|---|---|---|
| (52) | bolts M8 - Automatic roller tensioner (accessories belt) | Tightening to 2,2 m.daN |
| bolts M10 - Dynamic roller tensioner (accessories belt) | Tightening to 4,7 m.daN | |
| (53) | Roller tensioner | Tightening to 4,7 m.daN |
| (54) | Support for auxiliary equipment | Tightening to 2,3 m.daN |
| (55) | Multifunction support | Tightening to 2,3 m.daN |
| (56) | Power steering pump pulley | Tightening to 2,3 m.daN |
| (57) | Power steering pump | Tightening to 2,3 m.daN |
| (58) | bolts - Alternator | Tightening to 5 m.daN |
| (59) | Alternator power circuit | Tightening to 1,4 m.daN |
| (60) | bolts - air conditioning compressor | Tightening to 2,3 m.daN |
7. Starter
| Reference | Designation | Tightening torque |
|---|---|---|
| (61) | bolts - Starter | Tightening to 2 m.daN |
Parts & tools for this job For 2005 Citroën C6
- PARTEngine gasket setSearch: Citroën C6 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.