Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Body - roof and headlining12 Body shell13 Lighting and signalling14 Wipers and washers15 Fascia and interior panels16 Front seats17 Rear seats18 Electrical - general19 Starting and charging20 Wiring harnesses21 Instruments and warning lamps22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën DS3 Factory Workshop Manual (2009-2019)01 · Engine
01 · Engine

Dismantling - re-assembly: Engine and gearbox assembly

Make
Citroën
Model
DS3 Factory Workshop Manual
Year
2009–2019
Section
Engine assembly › Dismantling - re-assembly: Engine and gearbox assembly
EngineDismantling - re-assembly: Engine and gearbox assembly

Dismantling - re-assembly: Engine and gearbox assembly

Citroën DS3 · Removal-fitting · Ref. B1BG01BYP0

Applies to: 1.2 i VTi (EB2) or EB0 injection

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

Equipment: A tie strap.

toolReferenceDesignation
Figure e5ab05kt
[0004]lifting bench
Figure e5ab05lt
[0194-T]Set of plugs
Figure e5ai007t
[0165-2]Cable pliers for flexible clips
Figure e5ab0x1t
[0005-C]
[0005-G]
Set of power train retaining supports
Figure e5ag05ht
[0216-G2]Forks for removing gearbox control rods

2. Preliminary operations

N.B.: Removal is from underneath the vehicle.

Place the vehicle on a two-post ramp.

CAUTION: Strap the vehicle on the 2 column lift.

Set the gearbox in neutral.

Disconnect the ancillaries battery.

Remove the rear seat cushion.

Figure b1hg3urd

Remove the blanking piece (1).

Disconnect the connector   (at "a").

Reconnect the ancillaries battery.

Start the engine.

As soon as the engine has stopped of its own accord, switch off the ignition.

N.B.: This operation drops the pressure of fuel in the low pressure fuel supply circuit.

3. Removing

Disconnect the ancillaries battery.

Remove the air filter housing.

Figure b1bg3jsd

Release the fuel supply and return pipes (2)   (at "d").

CAUTION: Protect the environment with a cloth.

CAUTION: Plug the fuel circuit unions; Using the tools [0194-T].

Uncouple the fuel supply and return pipes (2)   (at "e").

Release the vacuum pipe   (at "b").

Uncouple the vacuum pipe ()   (at "c").

3.1. Vehicles equipped with a supply management and protection control unit

Figure b1hg3xvd

Detach the cover (3)   (at "f").

Figure b1hg3xwd

Remove the nut (4).

Move the electrical cable (5) aside.

3.2. Removing   (continued)

Remove:

Figure b1bg3fxd

Remove the bolt (8).

Unclip and move aside the electrical harnesses attached to the support (7).

Move aside the engine harness ().

Remove:

  • The (6) bolt
  • The bracket (7)
Figure b2cg2thd

Uncouple; Using tool [0216-G2]:

  • The gear engagement ball joint (11)
  • The gear selection control ball-joint (9)

Release the gear engagement and selection cable sleeve stops   (at "g").

Move aside all of the gearbox control cables.

Uncouple the gear engagement transfer bar   (at "h").

Pivot the gearchange transfer earth (10).

Figure b1bg3fzd

Drain the cooling system.

Disconnect the pipes (12).

Remove the fan.

Drain gearbox.

Figure b1bg3g0d

Remove:

  • The front wheels
  • The protective panel under the engine
  • The front left-hand splash-shield
  • The drive shafts
  • The bolts (13)
  • The stabiliser bar (14)

ESSENTIAL: Wait at least one hour before carrying out any work on the exhaust line (15).

Move aside and clip the exhaust line (15).

Figure b2cg2tid

Remove the 2 bolts (16).

Move aside the hydraulic clutch control slave cylinder (17) (Without opening the hydraulic circuit).

Figure b1bg3g2d

Remove:

  • The bolts (18)
  • The reaction link (19)

3.3. Vehicle with air conditioning

Figure c5hg1ixd

Remove the accessories drive belt.

Disconnect the connector   (at "j").

Remove the bolts (20).

Without disconnecting the hoses, move aside and clamp the air conditioning compressor (21).

3.4. Removing   (continued)

Figure c5hg1iyd

Disconnect the pipes (22); Using tool [0165-2].

Figure c5hg1izd

Uncouple and move aside the hose (23)   (at "k").

Place the vehicle at a height of 50 cm from the ground.

Install the lifting table [0004] with the supports [0005-C], [0005-G] under the engine-gearbox assembly.

Mark the location of the lifting table [0004] on the ground.

Figure b1bg3jtd

Position:

  • The bracket [0005-C]   (at "m")
  • The bracket [0005-G]   (at "l")
Figure b2cg2tkd

Position the supports [0005-C]   (at "n", "p").

Figure b2cg2tld

Remove:

  • The 6 bolts (24)
  • The engine mounting (25)
Figure b1bg3g3d

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Remove:

  • The 2 bolts (26)
  • The power unit   (from underneath the vehicle)

4. Refitting

CAUTION: Adhere to the tightening torques.

For: EB0 injection or 1.2 i VTi (EB2)

Tightening torques:

Tightening torques:

Position:

  • The lifting bench [0004] under the vehicle   (to the marks made during removal)
  • The vehicle has a height of 50 cm

Lift the elevating platform [0004].

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body; If necessary move the engine-gearbox assembly to facilitate its repositioning.

Reposition the engine-gearbox assembly opposite its upper fixings.

Refit:

  • The engine mounting (25)
  • The bolts (26), (24)

Remove the supports [0005-C], [0005-G].

Withdraw the lifting bench [0004] from under the vehicle.

4.1. Vehicle with air conditioning

Reposition the air conditioning compressor (21).

Refit the 3 bolts (20).

Connect the connector   (at "j").

Refit the ancillary belt.

4.2. Refitting   (continued)

Refit:

  • The 2 bolts (18)
  • The reaction link (19)

Position the hydraulic clutch control slave cylinder (17).

Refit the 2 bolts (16).

Connect the hose (23)   (at "k").

Put the exhaust line (15) in place.

Refit:

  • The stabiliser bar (14)
  • The 2 bolts (13)
  • The drive shafts
  • The front left-hand splash-shield
  • The front wheels
  • The vehicle to its wheels

Remove the strap.

Couple up:

  • The gearchange transfer rod   (at "h")
  • The hoses (12)
  • The hoses (22); Using tool [0165-2]

Refit the cooling fan.

Position the gearbox control cables assembly.

Lock the gear engagement and selection cable sleeve stops   (at "g").

Couple up:

  • The gear engagement ball joint (11)
  • The gear selection control ball-joint (9)

Refit:

  • The bracket (7)
  • The bolt (6)

Fasten the electrical harnesses attaching to the support (7).

Refit:

4.3. Vehicles equipped with a supply management and protection control unit

Position the positive supply cable (5).

Refit the nut (4).

Clip on the cover (3)   (at "f").

4.4. Refitting   (continued)

Couple up:

  • The fuel supply and return pipes (2)   (at "e")
  • The vacuum pipe   (at "c")

Clip in place:

  • The fuel supply and return pipes (2)   (at "d")
  • The vacuum pipe   (at "b")

Connect the connector   (at "a").

Refit:

  • The blank (1)
  • The rear seat cushion

Fill the gearbox.

Fill the cooling system.

4.5. Additional operations

CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.

Reconnect the ancillaries battery.

CAUTION: If removing or replacing the engine speed sensor target, perform a procedure to initialise the engine speed sensor target.

Start the engine.

Check that there are no leaks.

Stop the engine.

Refit the under-engine protection.

Parts & tools for this job For 2009 Citroën DS3

As an Amazon Associate we earn from qualifying purchases.