Removal / refitting: Engine/gearbox assembly
- Make
- Citroën
- Model
- DS3 Factory Workshop Manual
- Year
- 2009–2019
- Section
- Engine assembly › Removal / refitting: Engine/gearbox assembly
Removal / refitting: Engine/gearbox assembly
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Tooling
| Tool | Reference | Description |
|---|---|---|
| [0004] | Lifting table |
| [0005] | [] set of retaining supports |
| [0165-Z] | Pliers for removing and refitting the spring clips |
| [0194-T] | Set of plugs |
| [0216-G1] | Forks for removing gearbox control rods |
| [0216-G2] | Forks for removing gearbox control rods |
2. Removal
ESSENTIAL: Observe the safety and cleanliness instructions which are specific to high-pressure diesel injection engines (H.D.I.).
Place the vehicle on a lift.
Slacken the front wheel bolts.
Take down:
- The battery cover
- The engine cover
Disconnect the battery.
Uncouple and move aside the fuel supply and return pipes (In "a"); Close using tool [0194-T].
CAUTION: Plug the openings of the air intake circuit.
Take down:
- The air inlet housing (4)
- The air inlet duct (5)
- The air duct (2)
- The air filter housing (1)
- The engine management ECU cover (3)
- The battery
- The engine management ECU
Unclip and move aside the electrical harnesses attached to the battery tray.
Remove the battery tray ().
Disconnect, unclip and move aside the engine electrical harness ().
Disconnect the earth cable (To body).
Remove the protective plate from under the engine.
Drain:
- The cooling system
- The gearbox
Detach and move aside:
- The vacuum pipe (In "b", "c")
- Flexible hose (6)
- Flexible hose (7)
Uncouple the gearbox controls (8); Using the tools [0216-G1], [0216-G2].
Remove the screw (11).
Lift the vehicle.
Remove the screw (10).
Move aside: The gearbox controls (8) and the gearbox controls support (9).
Take down:
- The front wheels
- Front splash shields
Disconnect the connector of the preheater unit (In "d").
Take down:
- Crossmember (17)
- Crossmember (16)
- The damper (12) with the engine subframe extensions (13)
- The torque reaction link (14)
Take down:
- Crossmember (16)
- The torque reaction link (14)
Detach and move aside: The exhaust pipe 15.
Take down:
- The drive shafts (18)
- The sub-frame (19)
CAUTION: Do not damage the air conditioning pipes.
Disconnect the connectors (In "e").
Take down:
- The ancillary drive belt (20)
- The screws (21)
Move aside and secure the air conditioning compressor (22) (without disconnecting the pipes).
Remove the fan.
Remove bolts (23).
Move aside: The hydraulic clutch control slave cylinder (24).
Lower the vehicle.
Move aside: The pre-heating unit electrical harness.
Install the lifting table [0004] with the supports [0005] under the engine-gearbox assembly.
Fix the engine support bracket [0005] on the cylinder block.
"A": Vehicle with air conditioning.
Fix the intermediate support [0005] on the air conditioning compressor support.
"B": Vehicle without air conditioning.
Fix the intermediate mounting [0005] on the cylinder block.
Tighten all the fixings of the supports.
Raise the lifting table [0004] slightly to place the engine-gearbox assembly under stress.
Take down:
- The screws (26)
- The screws (29)
- The engine mountings (27), (25)
Uncouple and move aside the pipe (28).
Remove bolts (30).
Draw marks on the ground to indicate the position of the engine-gearbox assembly.
CAUTION: Ensure that there is no interference between the engine-gearbox assembly and the body.
Remove the power unit assembly.
3. Refitting
CAUTION: Observe the tightening torque values.
Tightening torques:
Relocate the engine-gearbox assembly.
Fit:
- The engine mountings (27), (25)
- The screws (26)
- The screws (29)
- The screws (30)
Lower the lifting bench [0004] and the tools [0005] and move them aside.
Connect the hose (28).
Relocate:
- The hydraulic clutch control slave cylinder (24)
- The pre-heating unit electrical harness
Reinstall screws (23).
Bleed the clutch hydraulic circuit (If necessary).
Fit: The cooling fan.
Unclip - Reposition: The refrigeration compressor (22) (Without disconnecting the pipes).
Fit:
- The screws (21)
- The ancillary drive belt (20)
Connect the connectors (In "e").
Fit:
- The sub-frame (19)
- The drive shafts (18)
Recouple: The exhaust pipe 15.
Fit:
- The torque reaction link (14)
- The damper (12) with the engine subframe extensions (13)
- Crossmember (16)
- Crossmember (17)
Fit:
- The torque reaction link (14)
- Crossmember (16)
Reconnect: The pre-heat unit connector (In "d").
Fit:
- Front splash shields
- The front wheels
Put in place: The gearbox controls (8) and the gearbox controls support (9).
Fit:
- The bolt (10)
- The bolt (11)
Couple the gearbox controls (8).
Position and couple up:
- Flexible hose (7)
- The pipes (6)
- The vacuum pipe (In "b", "c")
Refill:
- The engine cooling system
- The gearbox
Refit the protective panel under the engine.
Reconnect the earth cable (To body).
Clamp - Reconnect: The engine electric harness.
Refit the battery tray.
Clip: The electrical harnesses adjoining the battery box.
Remove the plugs from the openings of the air intake circuit.
Fit:
- The engine management ECU
- The battery
- The engine management ECU cover (3)
- The air filter housing (1)
- The air duct (2)
- The air inlet duct (5)
- The air inlet housing (4)
Connect the fuel supply and return pipes (In "a").
CAUTION: Perform the operations that are necessary after a battery reconnection.
Connect the battery.
Fit:
- The engine cover
- The battery cover
4. Checks
Read the fault codes; Using the diagnostic tool.
Check:
- There is no noise
- The circuits are free from leaks
Carry out:
- A road test
- A reading of the auto-diagnostic memories
Parts & tools for this job For 2009 Citroën DS3
- PARTEngine gasket setSearch: Citroën DS3 2009 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.