Removing - Refitting: Engine - Gearbox (EP6DTS)
- Make
- Citroën
- Model
- DS3 Factory Workshop Manual
- Year
- 2009–2019
- Section
- Engine assembly › Removing - Refitting: Engine - Gearbox (EP6DTS)
Removing - Refitting: Engine - Gearbox (EP6DTS)
ESSENTIAL: Observe the safety and cleanliness recommendations.
ESSENTIAL: Wait at least one hour before carrying out any work on the exhaust line.
1. Tooling
| tool | Reference | Designation |
|---|---|---|
| [0141-T1] | Pipe with adaptor for SHRADER valve |
| [0004] | lifting bench |
| [0005-G] | [] set of retaining supports |
| [1520] | plugs for click-fit unions |
2. Removing
CAUTION: Put plugs in place at the turbocharging exchanger air inlets and outlets, at the turbocharger air inlets and outlets and at the inlet manifold air inlet.
ESSENTIAL: Drop the petrol pressure by connecting the end of the tool [0141-T1] onto the valve SCHRADER and collect the fuel in a receptacle.
Place the vehicle on a 2-post lift.
Strap the vehicle on the 2 column lift.
Disconnect the battery.
Remove the under engine protection.
CAUTION: Before uncoupling, clean all the unions on the low pressure circuit (if necessary).
Unclip (at "a") and slide the supply management and protection control unit (2).
Uncouple: The vacuum circuit pipe (at "b").
Remove:
- The engine management ECU cover (3)
- The battery style cover (5)
- The air inlet deflector (4)
- The turbocharger air inlet union (1)
Drain the cooling system.
Remove:
Remove:
- The engine management ECU (7) (Move it to one side)
- The battery
Unclip the electrical harnesses from the battery tray.
Remove:
- The retaining plate (8) of the air inlet connector (9)
- The battery tray
- The air inlet union fixing (10)
- The air inlet unions (9), (11), (6)
Uncouple: The heater matrix inlet and outlet pipes (12).
Uncouple the fuel supply and return pipes (at "c").
N.B.: Plug the fuel supply and return pipes.
Release the electric harnesses (at "d").
Remove:
- The bolt (13)
- The battery carrier (14)
Disconnect:
- The terminal block (15) harness (at "e", "f")
- The engine harness (16) (at "g")
Remove the harness protective trough (17).
Pinch the tabs of the 2 ball joints (18) (at "h"); Using a pair of thin-nosed pliers.
Uncouple the 2 ball joints (18).
Remove the 2 bolts (19).
Move aside the gear control cables support (20).
Remove the fixing bolt from the earth cable on the gearbox (at "j").
Remove:
- The accessories drive belt
- The stabiliser bar (21)
- The exhaust clip (24)
- The exhaust pipe (23) (Disengage the exhaust line rearwards)
Unplug:
- The connectors (at "k")
- The reverse gear connector (at "l")
Unclip the clip (at "m").
Uncouple: The hydraulic clutch control slave cylinder supply pipe (26).
CAUTION: Prepare for the flow of brake fluid.
CAUTION: During the operation, do not exert pressure on the bleed union.
Remove:
- The screw () of the earth cable (at "n")
- The wheels
- The mud shields
- The drive shafts
- The reaction link (22)
- The front sub-frame
- The air-conditioning compressor (according to equipment)
Move aside and secure the air conditioning compressor (25) (according to equipment).
Position:
- The tools [0005-C] (at "p", "q")
- The tool [0005-G] (at "r")
Centre the lifting bench [0004] beneath the engine.
Fix the tools [0005-C], [0005-G] to the lifting table [0004].
Raise the lifting table [0004] to relieve the pressure on the engine-gearbox assembly.
N.B.: Mark the location of the lifting table on the ground.
Remove:
- The bolts (27)
- The bolts (28)
- Upper right-hand engine support (29)
Remove the gearbox support fixings (30).
CAUTION: Ensure there is no interference between the engine-gearbox assembly and the vehicle.
Remove the engine-gearbox assembly from the underneath of the vehicle.
3. Refitting
CAUTION: Adhere to the tightening torques.
Tightening torques:
Refit the engine-gearbox assembly.
Refit:
- The fixings (30) from the gearbox support
- Upper right-hand engine support (29)
- The bolts (28)
- The bolts (27)
Remove the lifting table [0004] and the tools [0005-C], [0005-G].
Refit:
- The air-conditioning compressor (according to equipment)
- The front sub-frame
- The reaction link (22)
- The drive shafts
- The mud shields
- The wheels
- The screw () of the earth cable (at "n")
Couple up: The hydraulic clutch control slave cylinder supply pipe (26).
Clip in the clip (at "m").
Connect:
- The reverse gear connector (at "l")
- The connectors (at "k")
Refit:
- The exhaust pipe (23)
- The exhaust clip (24)
- The stabiliser bar (21)
- The accessories drive belt
Refit:
- The fixing bolt securing the earth cable on the gearbox (at "j")
- The gear control cables support (20)
- The 2 bolts (19)
Connect the 2 ball joints (18).
Refit: The harness protective trough (17).
Reconnect:
- The engine harness (16) (at "g")
- The terminal block (15) harness (at "e", "f")
Couple up the heater matrix inlet and outlet pipes (12).
Refit:
- The battery carrier (14)
- The bolt (13)
Clip the electric harnesses (at "d").
Couple up: The fuel feed and return pipes (at "c").
Refit:
- The air inlet unions (9), (11), (6)
- The air inlet union fixing (10)
- The battery tray
- The retaining plate (8) of the air inlet connector (9)
Clip the electrical harnesses on the battery tray.
Refit:
- The battery
- The engine management ECU (7)
Refit:
Remove the tools [1520].
Fill and bleed the cooling system.
Refit:
- The turbocharger (1) air inlet union
- The air inlet deflector (4)
- The battery style cover (5)
- The engine management ECU cover (3)
Couple up: The vacuum circuit pipe (at "b").
Slide the supply management and protection control unit (2) and reclip it (at "a").
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Refit the under-engine protection.
Reconnect the battery.
Parts & tools for this job For 2009 Citroën DS3
- PARTEngine gasket setSearch: Citroën DS3 2009 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.