Dismantling - re-assembly: Engine - gearbox
- Make
- Citroën
- Model
- DS5 Factory Workshop Manual
- Year
- 2011–2015
- Section
- Engine assembly › Dismantling - re-assembly: Engine - gearbox
Dismantling - re-assembly: Engine - gearbox
ESSENTIAL: Observe the safety and cleanliness recommendations.
ESSENTIAL: Only those personnel who have received special training on electric vehicles are qualified to operate on the vehicle (please observe the regulations that are in force in the country concerned).
ESSENTIAL: Disconnect the vehicle electrical supply.
1. Tooling
| tool | Reference | Designation |
|---|---|---|
| [0004] | lifting bench |
| [0005-C] | [] set of retaining supports (Right hand) |
| [0005-G] | [] set of retaining supports (Adjustable supports) | |
| [0165-2] | Cable pliers for flexible clips |
| [0188-AQ] | Lifting ring |
| [1617-J] | Sealing plugs HDI |
| [0193-A] | Tool for removing exhaust clips |
| [7115-T] | [] socket for removing the gearbox mounting shaft |
2. Foreword
CAUTION: The engine-gearbox assembly is removed from underneath using the lifting bench [0004] and its set of supports [0005]. However, it is possible to proceed using a workshop crane by screwing the lifting ring [0188-AQ] into the cylinder head (Vacuum pump side).
3. Removing
Raise the vehicle, wheels hanging.
Strap the vehicle onto the lift.
Remove:
- The engine cover
- The protective panel under the engine
Drain:
- The cooling system
- The gearbox
- The engine (If necessary)
Remove:
- The front wheels
- The front splash shields
- The reversible alternator
CAUTION: During removal: Plug the fuel pipes; Using the plugs [1617-J].
Uncouple the unions of the fuel low pressure circuit (at "a").
Unclip - Move aside the fuse holder box (4); By means of a screwdriver (at "b").
Remove:
- The air filter housing (1) with the air flow sensor
- The air union (5)
- The battery style cover (2)
- The ancillaries battery
- The engine fuse box (3) cover
Remove:
- The nuts (6)
- The bolts (7)
- The (9) bolt
- The bracket (8)
Remove:
- The earth cable (11)
- The positive supply cable 12
Disconnect the connectors (at "c", "d", "e", "f", "g").
Open the flap (10).
Take out the engine harness from the engine fusebox.
Uncouple:
- The cooling hoses (13); Using tool [0165-2]
- The expansion pipe (14) (according to equipment)
Detach and move aside:
- The heater matrix pipe (at "h")
- The heater matrix electric coolant pump hose (at "m")
- The vacuum pipe (at "j", "k")
Disconnect the electrical connector of the exhaust gas pressure sensor (at "l").
Release and move aside the electrical harness (15).
Disconnect the connector (at "n", "q").
Remove the nut (16) (Earth cable).
Release and move aside the electrical harness (17) (at "p").
CAUTION: Observe the procedure for removal of the cooling circuit pipes.
Remove the nut (19) (Drive train cooling hose support).
Uncouple:
- The coolant hose (20) (at "s")
- The coolant hose (18) (at "r")
Unclip - Move aside the hoses (18), (20) (at "t").
Remove:
- The guard under the front bumper (21)
- The front subframe extensions (22)
- The front driveshafts
- The reaction link (24)
- The front subframe (25)
- The air union (23)
Disconnect and move aside: The electrical harness (at "u").
Remove the fixings from the air conditioning compressor (26).
Move aside and secure: The air-conditioning compressor (26) (Without opening the refrigerant circuit).
Uncouple and separate engine coolant hoses (27); Using tool [0165-2].
Remove the particulate emission filter.
Fix the tools [0005-G], [0005-C] to the lifting table [0004].
Position the vehicle at a height of 50 cm (Approximately).
Centralise the lifting table 0004 under the engine/gearbox assembly.
Support the engine-gearbox assembly using the tools [0005-C], [0005-G].
Raise the lifting table [0004] slightly to place the engine-gearbox assembly under stress.
Make a mark on the ground.
Remove:
- The 4 bolts (33)
- The 4 bolts (29)
- The engine mounting (28)
- The 2 nuts (30)
- The nut (31)
- The engine mounting (32)
Carefully lower the lifting bench [0004].
Move aside the cooling hoses and the earth harness.
CAUTION: When removing the engine-gearbox assembly: Ensure that there is no fouling between the engine-gearbox assembly and the body.
CAUTION: During removal, do not damage the core of the cooling radiator(s). Store the parts in a clean and appropriate place.
Removal method:
- The fan unit [0004]
- Make sure there is no fouling with the air conditioning compressor (26)
- Raise the lift
- Remove the power unit assembly
4. Refitting
CAUTION: Adhere to the tightening torques.
Tightening torques:
CAUTION: Always fit new locknuts.
CAUTION: When refitting: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Position:
- The lifting bench [0004] under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Position the cooling hoses and the earth harness.
CAUTION: Align the engine-gearbox assembly before tightening the upper suspension bolts.
Refit:
- The engine mounting (32)
- The nut (31)
- The nuts (30)
- The engine mounting (28)
- The bolts (29)
- The bolts (33)
Remove the tools [0005-C], [0005-G].
Withdraw the lifting bench [0004] from under the vehicle.
Refit the particle emission filter.
Couple up the cooling hoses (27); Using tool [0165-2].
Refit:
- The air-conditioning compressor (26)
- The air conditioning compressor fixings (26)
- The air union (23)
Connect the electric harness () (at "u").
Refit:
- The sub-frame (25)
- The reaction link (24)
- The drive shafts
- The front subframe extensions (22)
- The guard under the front bumper
Couple the cooling hose (18) (at "r").
Couple the cooling hose (20) (at "s).
Attach the cooling hoses (18), (20) (at "t").
Refit the nut (19) (Drive train cooling hose support).
Clip the electrical harness (17) (at "p").
Connect the connectors (at "n", "q").
Refit the nut (16) (Earth cable).
Clip the electrical harness (15).
Reconnect the electrical connector of the exhaust gas pressure sensor (at "l").
Couple up:
- The vacuum pipe (at "j", "k")
- The heater matrix electric coolant pump hose (at "m")
- The heater matrix pipe (at "h")
- The expansion pipe (14) (according to model)
- The cooling hoses (13); Using tool [0165-2]
Reposition and clip in the engine electrical harness.
Close the flap (10).
Connect the connectors (at "c", "d", "e", "f", "g").
Refit:
- The positive supply cable 12
- The earth cable (11)
- The bracket (8)
- The (9) bolt
- The bolts (7)
- The nuts (6)
- The engine fuse box (3) cover
CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.
Refit:
- The ancillaries battery
- The battery style cover (2)
- The air union (5)
- The air filter housing (1) with the air flow sensor
- The fuse box (4); (at "b")
Remove the sealing caps [1617-J].
Connect up all the low pressure fuel supply unions (at "a").
Refit:
- The reversible alternator
- The accessories drive belt (new)
- The front splash shields
- The front wheels
CAUTION: Reconnect the vehicle electrical supply.
Fill with oil and top up:
- Engine
- Gearbox
Fill and bleed the cooling system.
5. Checks
Start the engine.
Check the absence of leaks or abnormal noise.
Check the operation of the air conditioning.
Refit the engine style cover.
Refit the under-engine protection.
Read and clear the fault codes.
Road test the vehicle.
Parts & tools for this job For 2011 Citroën DS5
- PARTEngine gasket setSearch: Citroën DS5 2011 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.