Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Locking, alarm and airbags23 Heating, air conditioning and audio
Citroën Saxo Factory Workshop Manual (1996-2004)01 · Engine
01 · Engine

Re-pressurising: CNG supply circuit

Make
Citroën
Model
Saxo Factory Workshop Manual
Year
1996–2004
Section
Air and fuel supply › Re-pressurising: CNG supply circuit
EngineRe-pressurising: CNG supply circuit

Re-pressurising: CNG supply circuit

Citroën Saxo · Removal-fitting · Ref. B1HGA7P0

Applies to: NVG dual fuel and 1.4i 75 (TU3JP) from RPO 9941

CAUTION: A gas leak may occur in the natural gas supply circuit at low pressure and disappear at high pressure and vice versa.

ESSENTIAL: Never re-tighten or unscrew connectors under pressure.

N.B.: Before refitting CNG components, make sure that no impurities have penetrated inside the piping or into the threads of the unions.

1. Recommended tools

Figure e5ap08ec

[1] leak detector FRAMET DF9.

2. Re-pressurising

Close the natural gas supply circuit again and re-tighten the connectors (see the relevant operation).

Figure b1hp1ppc

N.B.: The manual safety valve located at "a" on the CNG tank should be closed.

2.1. Achieving a defined pressure

To achieve a defined pressure in the high pressure supply circuit (in the CNG tank at the CNG pressure reducer), proceed as follows:

Figure b1hp1n5c

N.B.: Checking is done by using a "shunt" (2), placed between the CNG pressure sensor (1) and its connector (3). The output signal is registered using a multimeter on the terminal "b".

Open the manual safety valve on the CNG tank.

Run the engine in natural gas mode.

Close the manual safety valve, then inspect the voltage on the multimeter to obtain the pressure.

Figure d6ap01sc

The table indicates the relation between the pressure and the output voltage (50 bars = 1 volt).

2.2. Stage 1

Spray the unions already dismantled, with tool [1] (failing that, use soapy water).

Open then rapidly reclose the manual safety valve at "a" on the CNG tank to obtain a partial pressure in the CNG circuit.

Run the engine in natural gas mode until it changes to petrol mode.

Stop the engine.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system, Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

2.3. Stage 2

Spray the unions already dismantled, with tool [1] (failing that, use soapy water).

Open then rapidly reclose the manual safety valve at "a" on the CNG tank to obtain a partial pressure in the CNG circuit.

Run the engine in CNG mode until the pressure reaches around 50 bars (± 10 bar). (see operation: achieving a defined pressure).

Stop the engine.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

2.4. Stage 3

Open the manual safety valve at "a" on the CNG tank.

Run the engine in CNG mode until the pressure reaches around 100 bars (see operation: achieving a defined pressure).

Stop the engine.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

2.5. Stage 4

N.B.: This stage should be performed at a pressure of 200 bars, the CNG tank should therefore be filled to maximum capacity. If this is not the case, top up at the closest natural gas station.

Open the manual safety valve at "a" on the CNG tank.

Run the engine in natural gas mode.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

After an idle phase of at least 3 hours, carry out a final detection of leaks before supplying to the customer.

3. Additional operations

To prevent all risks of corrosion after using a leak detector:

  • Rinse the unions with clean water
  • Dry the unions with compressed air

Parts & tools for this job For 1996 Citroën Saxo

As an Amazon Associate we earn from qualifying purchases.