Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën Xsara Picasso Factory Workshop Manual (1999-2012)01 · Engine
01 · Engine

Removing - refitting: Engine and gearbox assembly

Make
Citroën
Model
Xsara Picasso Factory Workshop Manual
Year
1999–2012
Section
Engine assembly › Removing - refitting: Engine and gearbox assembly
EngineRemoving - refitting: Engine and gearbox assembly

Removing - refitting: Engine and gearbox assembly

Citroën Xsara Picasso · Removal-fitting · Ref. B1BG6BP0

Applies to: 1.6 HDi 110 or 1.6 HDi 110 particle emission filter (DV6TED4)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p059c

[1] Pliers for removing elastic clips 9029-T.

Figure e5ap27kc

[2] pliers for removing "clic" clips (-).0172.Z.

Figure b1bp032c

[3] lifting bench 5702-T.A.

Figure e5ap27lc

[4a] engine support 5704-T.

[4b] engine support 5704-T.

Figure e5ap1u3c

[5] Set of hose clamps 0 to 26 mm dia. 4153-T.

Figure e5ap27mc

[6] plugs kit (-).0194.T.

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Place the vehicle on a 2-post lift.

Slacken the front wheel bolts.

Remove the engine covers.

Disconnect the battery negative terminal.

Drain:

  • The cooling system (see the relevant operation)
  • The gearbox
Figure b1bp30ad

Disconnect, plug and move aside the pipes (1) and (2) Plug using the tools [6].

Place a hose clamp [5] on the tube (8).

Disconnect, blank off and move aside (blank the apertures using tool [6]):

  • The power steering return pipe (8) Using tool [2]
  • The power steering rotary valve link pipe (9)
  • The radiator venting hose (7) Using tool [1]
  • The upper hose (5) of the cooling radiator

Remove:

  • The lid of the engine compartment fusebox
  • The air ducts (3), (4) and (6)
  • The pre-heater unit
  • The injection ECU and its support

Unplug:

  • The negative electric cable on the body
  • The positive electric cable
  • The engine harness connectors in the engine compartment fusebox
Figure b2bp05rc

Remove the bolts (10).

Move aside the clutch slave cylinder (1) without opening the hydraulic circuit.

Unclip and move aside the relay unit.

Uncouple:

  • The pipes on the EGR electrovalve (mark the locations of the pipes on the EGR electrovalve)
  • The vacuum pipe of the braking servo
  • The click-fit pipes of the heater assembly

2.1. Vehicle with air conditioning

Figure c5hp1a7c

Disconnect the connector at " a ".

Remove:

  • The accessories drive belt (15) (see the relevant operation)
  • The bolts (12)
  • The air-conditioning compressor (13)

Hang the air conditioning compressor (13) on the vehicle body.

2.2. Vehicles all types

Uncouple the pipe (14).

Figure c4ap1dfd

Remove:

  • The (19) bolt
  • The (21) bolt
  • The reaction link (20)
  • The front wheels
  • The engine subframe (18) (see the relevant operation)
  • The drive shafts (16) (see the relevant operation)
  • The exhaust hose (17)

Position the bottom of the front bumper at 85 cm from the ground.

Centre the lifting bench [3] beneath the engine.

Lift the elevating platform [3].

Secure the engine-gearbox assembly using tool [4] in the following way:

  • Clutch end for vehicles with and without air conditioning: One tool [4a] in the recess in the bearing cap cover and another tool [4a] positioned between the LH gearbox output and the bearing cap cover
  • Clutch end for vehicles with air conditioning: One tool [4a] in the recess in the bearing cap cover and tool [4b] fixed on one of the air conditioning compressor fixings
  • Clutch end for vehicles without air conditioning: Tool [4b] fixed on the bearing of the LH driveshaft and one tool [4a] under the oil sump fixing edge

Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.

Figure b1bp30cc

Remove the 3 bolts (at "b").

Figure b2cp3w3c

Remove the nut (22).

Figure c4ap1dgd

Lower the power unit assembly.

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Raise the vehicle.

Mark the location of the lifting table on the ground [3].

Move the engine-gearbox assembly away from under the vehicle.

3. Refitting

Position the lifting bench [3] with the engine-gearbox assembly at the marks made at removal.

Carefully lower the vehicle.

Position the front bumper 85 cm from the ground.

Lift the elevating platform.

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Figure b2cp3w4c

Engage the screw (23) in the gearbox support.

Refit the nut (22) Tighten to 6,5 ± 0,5 daN.m.

Remove the 3 bolts (at "b") Tighten to 6 ± 0,6 daN.m.

Disengage the lifting bench [3].

Refit:

  • The exhaust hose (17)
  • The drive shafts (16) (see the relevant operation)
  • The engine subframe (18) (see the relevant operation)
  • The front wheels
  • The reaction link (20)
  • The (21) bolt Tighten to 4,5 ± 0,5 daN.m
  • The (19) bolt Tighten to 4,5 ± 0,5 daN.m

Connect the hose (15).

3.1. Vehicle with air conditioning

Unclamp the air conditioning compressor (13).

Refit:

  • The air-conditioning compressor (13)
  • The bolts (12)
  • The accessories drive belt (15)

Reconnect the connector (at "a").

3.2. Vehicles all types

Connect the cooling radiator bottom hose.

Lower the vehicle to the ground.

Couple up:

  • The click-fit pipes of the heater assembly (new seals)
  • The vacuum pipe of the braking servo

Position and clip the relay unit.

Reposition the clutch slave cylinder (11).

Refit the bolts (10).

Connect:

  • The engine harness connectors in the engine compartment fusebox
  • The positive electric cable
  • The negative electric cable on the body

Refit:

  • The injection ECU and its support
  • The pre-heater unit
  • The air ducts (3), (4) and (6)
  • The lid of the engine compartment fusebox
  • The upper hose (5) of the cooling radiator

Couple up:

  • The venting hose (7) Using tool [1]
  • The power steering rotary valve link pipe (9)
  • The power steering return pipe (8)

Remove the hose clamp [5].

Couple up:

  • The tube (2)
  • The tube (1)

Refill:

  • The gearbox
  • The cooling system (see the relevant operation)

Tighten:

  • The drive shafts (see the relevant operation)
  • The wheels to 9 ± 0,5 dan.m

Check the fluid levels:

  • For the power steering
  • The engine

Reconnect the battery negative terminal.

ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).

3.3. Vehicle with air conditioning

Check that the air conditioning system works properly.

3.4. Vehicles all types

Carry out:

  • A road test
  • A reading of the auto-diagnostic memories

Parts & tools for this job For 1999 Citroën Xsara Picasso

As an Amazon Associate we earn from qualifying purchases.