Removing - refitting: Engine/gearbox assembly (TU5)
- Make
- Citroën
- Model
- Xsara Picasso Factory Workshop Manual
- Year
- 1999–2012
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (TU5)
Removing - refitting: Engine/gearbox assembly (TU5)
1. Protection
Place a protector on the following elements:
- Front wings
- Driver’s seat
- Floor carpet (driver’s side)
- Steering wheel
2. Recommended tools
[1] lifting bench 5702-T.A.
[2] engine supports 5704-T.
[3] pliers to remove "clic" clips 4145-T.
[4] hose clamp 4153-T.
[5] pliers for removing and refitting hose clips 9029-T.
[6] final drive left-hand output oil seal fitting drift 7114-T.W (addition to tool box 7116-T).
[7] final drive right-hand output oil seal fitting drift 7114-T.X (addition to tool box 7116-T).
Additional tools:
- [8] Set of sealing plugs C.0188-T
- [9] 10 Square (drain spanner)
3. Removing
N.B.: The operation must be carried out from under the vehicle.
Disconnect the battery negative terminal.
Lift and support the vehicle with the wheels free.
Drain:
- The gearbox
- The cooling system (see the relevant operation)
Remove:
- The drive shafts (see the relevant operation)
- The mudflaps
- The reaction link (body fixing)
- Disconnect the oxygen sensor connector
- The front pipe of the exhaust
Remove:
- The nuts (1)
- The bolts (2)
- The bolts (3)
- The subframe
- Disconnect the power steering pressure sensor
Disconnect and release the clutch cable.
Disengage the retaining pins (4) from the gear selectors Using circlip pliers.
Disconnect the 2 click fit connectors.
N.B.: Remove the air filter in two stages Using tool [3].
Remove:
- The upper and lower hoses of the cooling radiator Fit sealing plugs [8]
- The elbow support of the air filter air inlet
- The injection ECU
- The terminal box cover
Unplug:
- The two nuts from the positive cables on the terminal box
- The two nuts from the positive cables in the fuse box
- The 2 black and brown multifunction connectors
- The earth wire on the gearbox
Remove the ECU support.
Take out the pins (5).
Disconnect the hoses from the heater matrix.
Disconnect the gear selector ball-joints (6) (see the relevant operation).
Uncouple:
- The brake servo hose (7)
- The injection rail petrol supply Fit a sealing plug [8]
Uncouple:
- The accelerator cable from the throttle housing
- The electrovalve/canister connection hose
Remove:
- The rubber protection on the power steering
- The retaining clips of the power steering pipes
- The auxiliary equipment drive belt, Use tool [9]
- The air conditioning compressor and secure it to a component on the body
- The tube connector and the hose on the power steering Use tools [3] and [4]
Fit sealing plugs [8].
Position the lifting table [1] and the supports [2].
Remove:
- The nut (8)
- The nuts of the right hand engine support (9)
- The engine mounting (10)
- The power unit assembly
4. Refitting
Proceed in the reverse order to removal.
N.B.: Always fit new Nylstop nuts.
Use the drifts [6], [7] to fit new final drive oil seals, having greased the space between the seal lips.
Coat the inside of the silentbloc of the gear box with type "G7" grease.
Fit the engine/gearbox assembly.
Fit and tighten the nut (8) (see the relevant operation).
Fit:
- The right-hand engine mounting (10)
- The nut (9) (see the relevant operation)
- The reaction link
- The exhaust
Connect and clip the hoses, harnesses and cables connected to the power unit.
Refit:
- The battery negative terminal
- The drive shafts (see the relevant operation)
- The air filter assembly
Fill and top up the level of the following of the following elements:
- Gearbox
- Cooling system
Bleed the cooling system (see the relevant operation).
Return the vehicle to its wheels.
Parts & tools for this job For 1999 Citroën Xsara Picasso
- PARTEngine gasket setSearch: Citroën Xsara Picasso 1999 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.