Removing - refitting: Engine/gearbox assembly (DW10TD)
- Make
- Citroën
- Model
- Xsara Picasso Factory Workshop Manual
- Year
- 1999–2012
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (DW10TD)
Removing - refitting: Engine/gearbox assembly (DW10TD)
1. Protection
Place a protector on the following elements:
- Front wings
- Driver’s seat
- Floor carpet (driver’s side)
- Steering wheel
2. Recommended tools
[1] hub immobilising tool 6310-T.
[2] pliers for removing plastic pegs 7504-T.
[3] pliers to remove "clic" clips 4145-T.
[4] filling cylinder 4520-T.
[5] pliers for removing and refitting hose clips 9029-T.
[6] engine support 5704-T.
[7] pivot ball-joint uncoupling lever 9509-T.
[8] lifting bench 5702-T.A.
[9] adaptor for filling cylinder 4222-T.
3. Removing
Raise and support the vehicle on a 2 -post lift.
Disconnect the battery (see the relevant operation).
Remove:
- The style cover
- The air cleaner (1)
- The flow meter (2)
- The metal support of the air filter
Disconnect and release the vacuum pump hose (3).
Unscrew:
- The front wheels
- The driveshaft nuts (road wheel side) Using tool [1]
Raise the vehicle.
Remove:
- The front wheels
- The front right hand splashshield Using tool [2]
- The auxiliary equipment drive belt (see the relevant operation)
Drain:
- The cooling system
- The power steering circuit
- The gearbox
Remove:
- The engine subframe (see the relevant operation)
- The left hand driveshaft (see the relevant operation)
4. Vehicle with air conditioning
Disconnect the electrical supply (4) from the air conditioning compressor.
Remove:
- The 2 mountings (5)
- The 2 mountings (7)
Suspend the air conditioning compressor (6) from the vehicle’s tow hitch.
5. Removing (continued)
Remove:
- The power steering pipes Using tool [3]
- The clutch housing closing plate
- The air duct between the flow meter and the turbocharger
Disconnect the engine exhaust.
Unclip the 3 gearbox controls (8) (see the relevant operation).
Remove the gearbox control mounting (11) (4 fixings).
Uncouple:
- The hoses (9) and (10) of the heater matrix
- The air throttle control hose
- The exhaust gas recycling valve control hose
Disconnect the 2 exhaust gas recycling control electrovalves.
CAUTION: Mark the location of the connectors.
Lower the vehicle close to ground-level.
Disconnect:
- The coolant housing degassing hose Using tool [5]
- The lower radiator hose Using tool [5]
- The radiator top hose Using tool [5]
Uncouple the clutch cable (12).
Disconnect:
- The accelerator potentiometer (16)
- The earth on the gearbox (14)
- The positive supply of the starter motor (13)
- The positive supplies (20) in the fuse box
- Connectors (21) and (22)
- The pre-heater unit (17)
- The injection double relay (18)
- The injection ECU (19)
Unclip, bend back and secure the electrical harness onto the engine.
Unscrew nut (15).
Raise the vehicle.
Position the vehicle’s towing hitch 50 cm from the ground.
Insert the lifting table 8 under the right side of the vehicle.
Centralise the lifting table 8 under the engine/gearbox assembly.
Remove the handle of the lifting bench [8] to finish positioning it.
Lift the elevating platform [8].
Support the engine-gearbox assembly using the tools [6].
N.B.: The points "a" in the blind holes of the cylinder block. The points "b" in the mounting of the lower torque reaction rod.
Raise the lifting table [8] slightly to place the engine-gearbox assembly under stress.
Disconnect and blank the following pipes:
- The diesel inlet pipe (29)
- The diesel return pipe (30)
Unclip the electrical harness mountings (27).
Remove:
- The cross beam (23)
- The nuts (24) and (25)
- The bolts (28)
- The bracket (26)
- The nut (15) (left side)
Gently lower the engine-gearbox assembly with the lifting bench.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Raise the vehicle.
Refit the handle to the lifting bench.
At "c", mark the location of the lifting bench on the floor.
6. Refitting
Position the lifting bench [8] at the reference points "c".
Remove the handle of the lifting bench [8] to finish positioning it.
Position the vehicle’s towing hitch 50 cm from the ground.
Lift the elevating platform [8].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Insert the gearbox mounting bolt into the mounting (left side).
Refit the nut (15).
Refit (right hand side):
- The bracket (26)
- The bolts (28) Tighten to 6,1 ± 0,5 daN.m
- The nut (25) Tighten to 4,5 ± 0,5 daN.m
- The nut (24) Tighten to 2,2 ± 0,2 daN.m
- The cross beam (23)
Tighten the nut (15) Tighten to 6,5 ± 0,6 daN.m.
Reclip the electrical harness (27).
Couple up:
- The diesel inlet pipe (29)
- The diesel return pipe (30)
Lower lifting table [8].
Raise the vehicle.
Take away the lifting table [8].
Lower the vehicle close to ground-level.
Reposition and clip in the engine electrical harness.
Reconnect:
- The injection ECU (19)
- The injection double relay (18)
- The pre-heater unit (17)
- Connectors (21) and (22)
- The positive supplies (20) in the fuse box
- The positive supply of the starter motor (13)
- The gearbox earth cable
- Accelerator pedal potentiometer (16)
Couple up:
- The clutch cable (12)
- The upper and lower hoses of the cooling radiator Using tool [5]
- The coolant housing degassing hose Using tool [5]
Raise the vehicle.
Reconnect the 2 exhaust gas recycling control electrovalves.
CAUTION: At the marks made when dismantling.
Couple up:
- The air throttle control hose
- The exhaust gas recycling valve control hose
- The hoses (10) and (9) of the heater matrix
Refit the gearbox control mounting (11).
Clip in the 3 gearbox controls (8).
Connect the engine exhaust.
Refit:
- The air duct between the flow meter and the turbocharger
- The clutch housing closing plate
- The power steering pipes
- The air-conditioning compressor
- The mountings (5)
- The mountings (7)
Reconnect the electrical supply of the air conditioning compressor.
Refit:
- The left hand driveshaft (see the relevant operation)
- The engine subframe (see the relevant operation)
- The auxiliary equipment drive belt (see the relevant operation)
- The front right mud guard
- The front wheels
Refill:
- The engine cooling system (see the relevant operation) Using tools [4] and [9]
- The power steering circuit (see the relevant operation)
- The gearbox
Connect the vacuum pump pipe (3).
Refit:
- The metal support of the air filter
- The flow meter (2)
- The air cleaner (1)
- The style cover
Reconnect the battery (see the relevant operation).
Adjust the gearbox controls.
Check that the air-conditioning is working correctly (vehicle with air conditioning).
Road test.
Read the diagnostic memories.
Parts & tools for this job For 1999 Citroën Xsara Picasso
- PARTEngine gasket setSearch: Citroën Xsara Picasso 1999 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.