freightliner Workshop Repair Guides

Freightliner Workshop Service and Repair Manuals

Intake Manifold - Removal|Page 538 > < Intake Manifold - Removal|Page 536
Page 4
background image

4. Install the EGR cooler.
5. Position the intake manifold and torque to 20.34 N.m (180 lbs. in.)
6. Install the throttle control assembly.
7. Instal the glow plug module.
8. Install the coolant hose at the thermostat housing.
9. Install the EGR control assembly.

10. Install the EGR control assembly chamber retaining bolts.
11. Install the EGR control assembly retaining bracket.

12. Install the swirl valve actuator.See: Actuator-Swirl Valve/Installation.
13. Install the fuel filter assembly See: Tune-up and Engine Performance Checks/Fuel Filter/Service and Repair/Fuel Filter/Installation.
14. Install the fuel lines.See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Supply Line/Service and Repair/Installation
15. Position and connect the engine harness.
16. Install the front lifting bracket.
17. Install rear lifting bracket.
18. Install the EGR tube.
19. Install the turbocharger.See: Powertrain Management/Fuel Delivery and Air Induction/Turbocharger/Service and Repair/Turbocharger -

Installation

20. Install the engine compartment lower silencer.
21. Fill the cooling system.See: Cooling System/Service and Repair
22. Install the vapor control valve.
23. Instal the charge air outlet tube (4).
24. Install the charge air resonator.
25. Install the air cleaner assembly.See: Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and Repair
26. Install the engine cover.
27. Connect the batteries.

Intake Manifold - Removal|Page 538 > < Intake Manifold - Removal|Page 536