landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Engine assembly|Page 234 > < Engine assembly|Page 232
Page 183
background image

ENGINE - V8

12-2-28 REPAIRS

21. Disconnect multiplug from EVAP purge valve. 

22. Remove nut securing engine harness  earth to 

body and disconnect engine harness  to main 
harness multiplug. 

23. Remove trim fixings securing toe board  and 

remove toe board. 

24. Disconnect 5 multiplugs connecting   engine 

harness to ECM. 

25. Release engine harness, pull into engine  bay 

and coil on top of engine. 

26. Raise vehicle on ramp. 

27. Remove 3 bolts securing oil cooling  pipes to 

sump and remove saddle clamps. 

28. Tie oil cooling pipes aside. 
29. Remove exhaust front pipe.

 

 + 

 MANIFOLDS AND EXHAUST 

SYSTEMS - V8, REPAIRS, Front pipe.

Engine assembly|Page 234 > < Engine assembly|Page 232