GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
3. REMOVE CENTER NO. 1 SUPPORT BEARING ASSEMBLY
(a)
Using a snap ring expander, remove the snap ring.
(b) Using SST and a press, press out the center support bearing and No. 2 dust deflector.
SST 09950-00020
(c)
Using SST and a press, press out the No. 1 dust deflector.
SST 09950-00020
INSPECTION
1. INSPECT PROPELLER INTERMEDIATE SHAFT
(a)
Using a dial indicator, measure the runout of the intermediate shaft.
Maximum runout: 0.8 mm (0.031 in.)
NOTICE:
The dial indicator must be set at a right angle to the center of the intermediate shaft.