Inspection
- Make
- Mazda
- Model
- MX-5 (NA) Factory Workshop Manual
- Year
- 1990–1992
- Section
- Inspection DRL unit › Inspection
Body electrical systemInspection
Inspection
DRL unit
Note
• While performing the following inspection, apply 12V to terminal j and ground terminal i.
- Apply 12V to terminal c, and measure the voltage at terminals d and k.
| Terminal | Voltage |
|---|---|
| d | 12V |
| k | 12V |
- If not as specified, replace the DRL unit.
- Remove 12V from terminal c.
- Apply 12V to terminals f and h, and measure the voltage at terminals d and k.
| Terminal | Voltage |
|---|---|
| d | 12V |
| k | 12V |
- If not as specified, replace the DRL unit.
- Remove 12V from terminals f and h.
- Ground terminal b, and check the voltage at terminals d and k.
| Terminal | Voltage |
|---|---|
| d | 12V |
| k | 12V |
- If not as specified, replace the DRL unit.
- Check for continuity between terminals of the DRL unit.
| Terminal | Continuity |
|---|---|
| d—f | Yes |
| h—k | Yes |
- If not as specified, replace the DRL unit.
Parts & tools for this job For 1990 Mazda MX-5
- TOOLDigital multimeterSearch: automotive digital multimeter
- PARTAssorted fuse kitSearch: car fuse assortment kit
- TOOLWire crimper and connector kitSearch: wire crimper connector kit
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.