Liner protrusion (page 8 of 11)
- Make
- Peugeot
- Model
- J5 Factory Workshop Manual
- Year
- 1982–1994
- Section
- Overhaul
Fit, fig. I :
- the camshaft,
- its thrust washer.
Tightening torque : 1.7 m.daN
(17 Nm, 12 lbf ft).
Position the camshaft and the crankshaft,
shown in fig. IV.
Fit, fig. II :
- a new paper gasket,
- the timing cover backplate.
Tighten the bolts to 1 m.daN (10 Nm, 7 lbf ft).
Fit the timing chain, fig. V with the timing
marks :
- on either side of the timing mark on the
camshaft wheel, - in line with the timing mark on the crank-
shaft wheel.
If there are no timing marks on the chain,
carry out the operation described in the
dismantling section.
Fit to the crankshaft, fig. III :
- the key,
- the chain wheel, with its timing mark out-
wards.
Fit a new locking plate to the camshaft wheel,
fig. VI.
Tighten the bolts to a torque of 2.25 m.daN
(22,5 Nm, 17 lbf ft).
FOLD UP the locking plate.
Parts & tools for this job For 1982 Peugeot J5
- PARTEngine gasket setSearch: Peugeot J5 1982 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.