porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Convertible Top Frame|Service and Repair|Page 5360 > < Convertible Top Frame|Service and Repair|Page 5358
Page 3
background image

8. Installing the tension cable

Insert tension cable -22- into the ball head -23- of the tension bow -21-.

9. Installing centring pegs

a. Position centring pegs -24- on the roof frame 1 -11- on the left and right and tighten with the fastening screws -25-.

Tightening torque: 7 Nm (5 ftlb.)

b. Affix cover cap -26- onto the centring pegs with Loctite 270.

10. Installing wedge

Position wedge -27- on the main bow -14- and tighten with the fastening screws -28-.
Tightening torque: 2.8 Nm (2.0 ftlb.)

11. Installing drive lever

Position drive lever -29- on the main bow -14- and secure the drive lever -29- with retaining clip -7- SLB 10.

Installing electrical wiring harness

1. Installing wiring harness on roof frame 1 and 3

a. Clip the fastened clips on the convertible-top wiring harness -30- into the holes provided on roof frame 1 -11- (clipped in 3 positions).
b. Clip the fastened clips on the wiring harness -30- into the holes provided on roof frame 3 -8- (clipped in 2 positions).

Dimension -inset X- up to model year 2001. Position angle on roof frame 3 and screw in with the fastening screws -33-. Fit rubber sleeve -31aand
plastic cover -31b- on the bracket -31-.
Tightening torque: 2.8 Nm

Dimension -inset Y- as of model year 2002. Position plastic bracket -32- on roof frame 3 and screw in with the fastening screws -33-.
Tightening torque: 2.8 Nm

Convertible Top Frame|Service and Repair|Page 5360 > < Convertible Top Frame|Service and Repair|Page 5358