–
| The installation is basically a reverse of the removal sequence, but observe the following when doing this: |
–
| Moisten new O-rings with coolant |
–
| Insert coolant pump into cylinder block |
–
| Install toothed belt rear bracket |
–
| Fit toothed belt and check timing → Chapter. |
|
|
|