Workshop Manuals Factory service & repair Skoda
01 Technical Data02 Self diagnosis, V.A.G Inspection Service03 Engine assy, cylinder block, crankcase04 Enginecrankshaft group, pistons05 Engine cylinder head, valve gear06 Engine lubrication07 Engine cooling08 Fuel supply, gas operation09 Exhaust turbocharger, G-charger10 Fuel preparation system Diesel injection11 Mixture preparation system, electronic inj., Gas12 Exhaust system13 Starter-current supply-CC14 Ignition system, glow plug system15 Clutch, control16 Torque converter17 Gearbox mechanics, operation, construction, diff.18 Gearbox, mechanics, gears, shafts, internal operation19 Automatic gearbox, control, assembly, housing20 Automatic gearbox, gears, control21 Final drive, differential, differential lock22 Front suspension, drive shafts23 Rear suspension, drive shaft24 Wheels, tyres. axle align25 ABS, ADR, TCS, EDL, ESP26 Brake, brake mechanics27 Brakes, hydraulics, regulator, servo28 Steering29 Body front30 Body centre, roof, frame31 Body, rear32 Sliding roof33 Exterior equipment34 Seat frames35 Aux. heater/heater booster36 Air conditioner37 Instruments, GCI38 Infotainment39 Windscreen wipe/wash system40 Lights, lamps, switches outside41 Lights, lamps, switches inside, anti-theft system42 Wiring
Skoda Superb II (3T, 2008 on)35 · Aux. heater/heater booster
35 · Heating & A/C

Removing and installing auxiliary heating

Make
Skoda
Model
Superb II
Year
3T, 2008 on
Section
Heating, Air conditioning › Removing and installing auxiliary heating
Aux. heater/heater boosterRemoving and installing auxiliary heating

Removing and installing auxiliary heating

Heating, ventilation, air conditioning system · Heating, Air conditioning · Repairing the auxiliary heating · Yeti from 2009 · Edition 10.2011

Removing

Note

  • Vehicle diagnostic tester and the function
    is called up under the guided functions.
  • Hose clamps MP7-602 (3094)
  • catch pan for workshop crane VAS 6208

Disconnect the battery-earth cable with the ignition off Electrical System Rep. gr. 27.

Remove the front right wheelhouse liner Body Work Rep. gr. 66.

Remove front bumper Body Work Rep. gr. 63.

Removing windshield washer reservoir Electrical System Rep. gr. 92.

Warning

The cooling system is under pressure, the coolant temperature can be over 100°C when the engine is warm - risk of burning!

Before repairs, reduce pressure and temperature if necessary.

Pinch off coolant hoses (1) and (2) with hose clamps MP7-602 (3094).

S82-0019

Pull out coolant hoses (1) and (2) from the auxiliary heating.

Extracting fuel line Chapter “Summary of components of auxiliary heating”.

Disconnect plug connections of auxiliary heating.

Remove fixing screw (1) (8 Nm).

S82-0004

Remove fixing nut (2) (8 Nm).

Slacken clamp (3) at coolant hose from the front frame side rail and remove fixing nut (1) (15 Nm).

S82-0005

Remove auxiliary heating (2).

Install

Installation is performed in the reverse order, pay attention to the following points:

Note

  • Engine Rep. gr. 19.
  • Vehicle diagnostic tester after installing and the function
    is called up under the guided functions.
  • Engine Rep. gr. 19.
  • Electrical System Rep. gr. 27.
  • If the auxiliary heating is replaced by a new one, it must run at full load mode for at least 10 minutes before handing it over to the customer. There can still be lubricant residues in or on the components of the auxiliary heating fitted at the factory, which evaporate after it is switched on for the first time. The smoke which occurs may worry the customer and he might look upon the auxiliary heating as defective.

Parts & tools for this job For 2008 Skoda Superb

As an Amazon Associate we earn from qualifying purchases.