Sequoia LTD 4WD V8-4.7L (2UZ-FE) (2001)
c. Apply adhesive to the hatched area in the illustration for both front and rear of the vehicle.
5. INSTALL ROOF DRIP SIDE MOULDING
a. Using a heat light, heat the moulding to 20 - 30 °C (68 - 86 °F).
NOTE: Do not heat the moulding excessively.
b. Lift the moulding release sheet from the face of moulding.
NOTE: When the moulding release sheet is removed, make sure that no dirt or dust can get onto the coated area.
c. Install the moulding.
NOTE:
-
Make sure that the body and moulding are heated to a proper temperature.
-
Do not depress the adhesive coated parts excessively but just hold them down with your thumb.
-
Scrape off any overflowing adhesive with a plastic spatula and clean the surface with a dry rag.
-
Take care not to drive the vehicle during the time described in the table.
6. w/ Roof rack: INSTALL ROOF RACK
Torque: 11 N.m (115 kg.cm, 8 ft.lb)