Vectra B
Starter Starter, Remove and Install Notice: G 0009 shows X 20 DTL.
Remove, Disconnect
Install, Connect Insert and fasten starter in cylinder block - tightening torque 45 Nm / 33 lbf. ft. Connect front exhaust pipe to return manifold with new gasket and new fastening nuts - tightening torque 20 Nm / 15 lbf. ft. Connect front exhaust pipe to muffler - tightening torque 12 Nm / 9 lbf. ft. Attach exhaust manifold support to exhaust manifold and cylinder block - tightening torque 25 Nm / 18.5 lbf. ft. Attach wiring trough to cylinder block (3 fastening bolts). Install all heat shields. Attach conduction bridges or rear wiring trough to glow plugs together with wiring connections.
Notice: Before assembling components of the intake system (hoses, connections, etc.), they must be cleaned of any possible contamination (grease, oil, etc.). When tightening the hose clamps, be sure to observe exactly the tightening torque of 3.5 Nm / 2.6 lbf. ft. Important! It is only ensured that the intake system is free of leaks, thus ensuring operational safety of the engine, if the hose clamps are tightened correctly to the prescribed tightening torque. Install, Connect Install charge air pipe with new seal ring. Install engine cover on cylinder head cover. Check engine oil level, if necessary correct. |
||||