Installing
- Make
- Volkswagen
- Model
- Beetle A5
- Year
- 2011–2019
- Section
- Heater unit › Installing
Heating, air conditioningInstalling
Installing
Installation is carried out in reverse order. Note the following when doing this:
- Installation position of seal (A) during assembly.
- All lines and wiring harnesses are routed correctly, not kinked or trapped.

- Installation position of seal (A) during assembly.
- All lines and wiring harnesses are routed correctly, not kinked or trapped.

Parts & tools for this job For 2011 Volkswagen Beetle
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Beetle 2011 cabin filter
As an Amazon Associate we earn from qualifying purchases.