Removing and installing heat exchanger, RHD vehicles
- Make
- Volkswagen
- Model
- Beetle A5
- Year
- 2011–2019
- Section
- Heater unit › Removing and installing heat exchanger, RHD vehicles
Removing and installing heat exchanger, RHD vehicles
Special tools and workshop equipment requiredHose clamps up to 40 mm 3093


Disconnect battery Electrical systemRep. gr.27.
Note
- Depending on the engine and the type of vehicle, it may be necessary to detach or remove the following components: top engine cover panel, air pressure pipe to throttle valve module and intake manifold, etc. Engine mechanicsRep. gr.13.
- The coolant circuit must be bled after it is opened Rep. gr.19.
- Cooling system is pressurized when engine is warm. Before conducting repairs, release pressure as necessary (e.g. carefully open expansion tank).
Place drip tray VAS 6208 beneath engine.
Drain coolant EngineRep. gr.19Engine cooling system.
Mark coolant hoses to heater and air conditioner unit.
Warning Risk of scalding.
When the engine is warm, the coolant temperature may be above 100 °C. The cooling system is pressurised.
If necessary, release pressure and reduce temperature before carrying out repairs.
Remove lock washers (1) and clip (2).
Remove heat shield for expansion valve (3) from plenum chamber bulkhead.

Clamp off coolant hoses to heat exchanger (2) with hose clamps up to 40 mm 3093.
Release securing clips (1) in direction of (arrow) and remove coolant hoses (2).

Push hose (A) onto upper union leading to heat exchanger.
Hold a container (B) under lower connection leading to heat exchanger (C).
Using a compressed air gun via hose (A), carefully blow coolant out of heat exchanger into container (B).

Loosen bolt (1) (6 mm hexagon socket head) on flange between coolant lines to heat exchanger (2) (do not unscrew completely).

Note
- Loosening the bolt (1) makes it possible to move the coolant lines to the heat exchanger (2).
Remove cover in front passenger's footwell General body repairs, interiorRep. gr.68Compartments, covers and trims
Remove left footwell trim (on centre console) General body repairs, interiorRep. gr.68Compartments, covers and trims.
Removing footwell vent on front passenger side → Chapter.
Warning Observe the general safety regulations when working on the airbag, belt tensioner and battery isolator units (pyrotechnical components) Rep. gr.69Occupant protection.
Place waterproof foil and water absorbing paper over floor covering in area under heat exchanger.
Detach adjusting lever (3) from temperature flap drive (4).
Separate connector (5) from temperature flap control motor.
Detach wiring harness (arrows) from heat exchanger cover (1).
Remove bolts (2) (2 Nm).
Remove heat exchanger cover with control motor (1) from heater and air conditioning unit.
Detach clamps (7) on coolant lines (8) (2 Nm).
Slowly separate coolant lines (8) from heat exchanger (6). Collect escaping coolant in a suitable container.

Detach adjusting lever (3) from temperature flap drive (4).
Separate connector (5) from temperature flap control motor.
Detach wiring harness (arrows) from heat exchanger cover (1).
Remove bolts (2) (2 Nm).
Remove heat exchanger cover with control motor (1) from heater and air conditioning unit.
Detach clamps (7) on coolant lines (8) (2 Nm).
Slowly separate coolant lines (8) from heat exchanger (6). Collect escaping coolant in a suitable container.

Pull out heat exchanger (2) from heater and air conditioning unit (1).

Note
- Before installing heat exchanger (2), renew seals (3).
Installation of heater exchanger is carried out in reverse order. Note the following when doing this:
Check seals attached to heat exchanger (1) and (2). Only install heat exchanger with intact seals.

Note
- An improperly bonded seal can roll up when heat exchanger is pushed into heater unit.
- If seal is damaged or improperly attached, cold air can flow past heat exchanger.
Check installation opening for heat exchanger (1) on heater and air conditioning unit for contamination while heat exchanger is removed.
Remove any dirt or coolant residue from heater and air conditioning unit, e.g. following removal of a leaking heat exchanger.

Renew seals (3) of heat exchanger (2).
Install heat exchanger (2) in heater and air conditioning unit (1).
Install heat exchanger cover.

Note
- Moisten seals (3) with coolant before installing and before joining to coolant lines.
- After renewing heat exchanger, renew coolant completely EngineRep. gr.19Engine cooling system.
- Check coolant circuit for leaks. In particular, inspect connections between coolant pipes and heat exchanger.
Tighten bolt (1) (6 mm hexagon socket head) on flange between coolant lines to heat exchanger (2) (2 Nm).

Check seal (C) is seated correctly on plenum chamber bulkhead.
If necessary, seal flanges for coolant pipes to heat exchanger (A) and for expansion valve (to evaporator, only on vehicles with air conditioning system) (B) at apertures in seal (C) with silicone adhesive sealant to prevent water ingress.

Connect coolant lines.
If normally fitted, install heat shield.
Replenish coolant and bleed cooling system EngineRep. gr.19Engine cooling.
Install heat exchanger cover.
Install cover in front passenger's footwell General body repairs, interiorRep. gr.68Compartments, covers and trims
Install left footwell trim (on centre console) General body repairs, interiorRep. gr.68Compartments, covers and trims.
Install footwell vent on front passenger side → Chapter.
Warning Observe the general safety regulations when working on the airbag, belt tensioner and battery isolator units (pyrotechnical components) Rep. gr.69Occupant protection.
Reconnect battery Electrical systemRep. gr.27.
Parts & tools for this job For 2011 Volkswagen Beetle
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Volkswagen Beetle 2011 cabin filter
As an Amazon Associate we earn from qualifying purchases.