Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder injection engine (1.4 l direct injection engine, turbocharger and supercharger)02 4-cylinder diesel engine (1.6 l engine, common rail)03 Fuel supply system - Diesel engines04 4-cylinder diesel engine (2.0 l engine, common rail, generation II)05 4-cylinder injection engine (1.8 l, 2.0 l TFSI engine, generation III)06 4-cylinder common rail engine (2.0 l, 4V, turbocharger)07 4-cylinder injection engine (1.2 l engine, 4 V, turbocharger)08 4-cylinder injection engine (1.4 l engine, 4 V, turbocharger)09 4-cylinder injection engine (2.0 l engine, chain drive)10 Fuel supply system - Petrol engines11 4-cylinder injection engine (1.2 l direct injection engine, turbocharger)12 6-speed manual gearbox 0AJ13 5-speed manual gearbox 0A414 6-speed manual gearbox 02Q15 6-speed dual clutch gearbox 02E16 7-speed dual clutch gearbox 0AM17 6-speed automatic gearbox 09G18 6-speed manual gearbox 02S19 Wheels and Tyres Guide20 Brake system21 Running gear, axles, steering22 Heating, air conditioning23 Electrical System, General Information24 Electrical system25 Electrical: Communication26 Vehicle-specifice paint information27 General body repairs, exterior28 General body repairs, interior
Volkswagen Beetle A5 (2011-2019)22 · Heating, air conditioning
22 · Heating & A/C

Removing and installing heat exchanger, LHD vehicles

Make
Volkswagen
Model
Beetle A5
Year
2011–2019
Section
Heater unit › Removing and installing heat exchanger, LHD vehicles
Heating, air conditioningRemoving and installing heat exchanger, LHD vehicles

Removing and installing heat exchanger, LHD vehicles

Electrical system

Special tools and workshop equipment requiredHose clamps up to 40 mm 3093
W00-0671
Drip tray for workshop hoist VAS 6208
W00-10228
Engine bung set VAS 6122
W00-10435
Compressed air gun, commercially available

Removing

Carry out the following work:

Disconnect battery Electrical systemRep. gr.27.

Note

  • Depending on the engine and the type of vehicle, it may be necessary to detach or remove the following components: top engine cover panel, air pressure pipe to throttle valve module and intake manifold, etc. Engine mechanicsRep. gr.13.
  • The coolant circuit must be bled after it is opened Rep. gr.19.
  • Cooling system is pressurized when engine is warm. Before conducting repairs, release pressure as necessary (e.g. carefully open expansion tank).

Place drip tray VAS 6208 beneath engine.

Drain coolant EngineRep. gr.19Engine cooling system.

Mark coolant hoses to heater and air conditioner unit.

Warning Risk of scalding.
When the engine is warm, the coolant temperature may be above 100 °C. The cooling system is pressurised.
If necessary, release pressure and reduce temperature before carrying out repairs.

If normally fitted, removed heat shield:

Unscrew nut (1) (10 Nm).

Remove lock washer (2) and clip (3).

Remove heat shield for expansion valve (4) from plenum chamber bulkhead.

M80-10044

For all vehicles:

Clamp off coolant hoses to heat exchanger (2) with hose clamps up to 40 mm 3093.

M80-10045

Release securing clips (1) in direction of (arrow) and remove coolant hoses (2).

Push suitable hose (A) onto upper connection leading to heat exchanger.

M80-10047

Hold suitable container (B) under lower connection leading to heat exchanger (C).

Using a compressed air gun via hose (A), carefully blow coolant out of heat exchanger into container (B).

Loosen bolt (1) (6 mm hexagon socket head) on flange between coolant lines to heat exchanger (2) (do not unscrew completely).

M80-10048

Note

  • Loosening the bolt (1) makes it possible to move the coolant lines to the heat exchanger (2).

Remove cover in driver's footwell General body repairs, interiorRep. gr.68Compartments, covers and trims

Remove left footwell trim (on centre console) General body repairs, interiorRep. gr.68Compartments, covers and trims.

If normally fitted, remove knee airbag General body repairs, interiorRep. gr.69Occupant protection, airbag.

Remove footwell vent on driver side → Chapter.

Warning Observe the general safety regulations when working on the airbag, belt tensioner and battery isolator units (pyrotechnical components) Rep. gr.69Occupant protection.

Vehicles with petrol engine:

Turn rotary knob on operating and display unit in such a way that temperature flap positioner (1) is in position shown in illustration. In this way, upper bolt for heat exchanger cover is accessible.

N80-10314

Unscrew bolts (arrows) (2 Nm) and remove heat exchanger cover (1) from heater and air conditioning unit.

N80-10315

Vehicles with diesel engine:

Unscrew bolts (arrows) (2 Nm) and remove heat exchanger cover (1) from heater and air conditioning unit.

M80-10049

For all vehicles:

Place waterproof foil and water absorbing paper over floor covering in area under heat exchanger.

Unscrew bolts (1) from clamps (3) of coolant lines (2) (2 Nm).

Slide clamps (3) back on coolant lines (2).

Slowly separate coolant lines (2) from heat exchanger (4). Collect escaping coolant in a suitable container.

Pull out heat exchanger (4) from heater and air conditioning unit (6).

M80-10050

Note

  • Before installing heat exchanger (4), renew seals (5).

Installing

Installation of heater exchanger is carried out in reverse order. Note the following when doing this:

Carry out the following work:

Check seals attached to heat exchanger (1) and (2). Only install heat exchanger with intact seals.

M80-10051

Note

  • An improperly bonded seal can roll up when heat exchanger is pushed into heater unit.
  • If seal is damaged or improperly attached, cold air can flow past heat exchanger.

Check installation opening for heat exchanger (1) on heater and air conditioning unit for contamination while heat exchanger is removed.

Remove any dirt or coolant residue from heater and air conditioning unit, e.g. following removal of a leaking heat exchanger.

M80-10052

Renew seals (5) of heat exchanger (4).

Install heat exchanger (4) in heater and air conditioning unit (6).

Connect coolant lines (2) to heat exchanger (4).

Fit clamps (3) at separating points and tighten bolts (1) (2 Nm).

Install heat exchanger cover.

M80-10050

Note

  • Moisten seals (5) with coolant before installing and before joining to coolant lines (2).
  • Deformed clamps must not be reinstalled but likewise renewed instead.
  • Clamps (3) must be secured as shown in the diagram.
  • Correct seating of the clamps (3) should be checked after the bolts (1) have been tightened. The clamps must completely encompass the flange on the heat exchanger and on the coolant pipe. They should not be in contact with other components.
  • After renewing heat exchanger, renew coolant completely EngineRep. gr.19Engine cooling system.
  • Check coolant circuit for leaks. In particular, inspect connections between coolant pipes and heat exchanger.

Tighten bolt (1) (6 mm hexagon socket head) on flange between coolant lines to heat exchanger (2) (2 Nm).

M80-10048

Check seal (C) is seated correctly on plenum chamber bulkhead.

If necessary, seal flanges for coolant pipes to heat exchanger (A) and for expansion valve (to evaporator, only on vehicles with air conditioning system) (B) at apertures in seal (C) with silicone adhesive sealant to prevent water ingress.

A87-0680

Connect coolant lines.

If normally fitted, install heat shield.

Replenish coolant and bleed cooling system EngineRep. gr.19Engine cooling.

Install cover in driver's footwell General body repairs, interiorRep. gr.68Compartments, covers and trims

Install left footwell trim (on centre console) General body repairs, interiorRep. gr.68Compartments, covers and trims.

Install footwell vent on driver side → Chapter.

If normally fitted, install knee airbag General body repairs, interiorRep. gr.69Occupant protection.

Warning Observe the general safety regulations when working on the airbag, belt tensioner and battery isolator units (pyrotechnical components) Rep. gr.69Occupant protection.

Reconnect battery Electrical systemRep. gr.27.

Parts & tools for this job For 2011 Volkswagen Beetle

As an Amazon Associate we earn from qualifying purchases.