Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)06 · Heating, air conditioning
06 · Heating & A/C

Expansion valve - remove and install

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Coolant gas loop › Expansion valve - remove and install
Heating, air conditioningExpansion valve - remove and install

Expansion valve - remove and install

Electrical equipment

Warning Before working on the heating and air conditioning system, it is necessary to disconnect the battery earth strap from the Battery AElectrical equipmentRep. gr.27Starter motor, alternator, battery.

Note

  • Check if the vehicle has a code radio. If so, request the anti-theft code before disconnecting the Battery A earth strap.
  • When the Battery Aearth strap is reconnected, check vehicle equipment (radio, clock, central locking, electric windows, etc.) according to the repair manual and/or instructions for use.
  • The coolant gas must be extracted or topped up with the Climate control recovery, recycling and refill set or EQ 7098 VAS 6008Air conditioning with R135a coolant gasRep. gr.00Technical data.
  • All refrigerant circuit components that are open must be closed with proper plugs to prevent humidity from entering them.
  • Use gloves to execute this operation because the evaporator wings can cause injuries.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.