Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)06 · Heating, air conditioning
06 · Heating & A/C

Installation

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Coolant gas loop › Installation
Heating, air conditioningInstallation

Installation

Installation is carried out in the reverse order of removal.

Installation of the joint in the evaporator
A87-0145

The evaporator needs to be made hermetic (A) by the upper part and the sides with the joint (B), in the contact region with the housing.

Note

  • So that condensation water may exit unimpeded, there cannot be any joint in the lower part of the evaporator.

Installation of the sealant in the coolant gas tubes of the evaporator
A87-0144

It is necessary to seal the coolant gas tubes (C) with the joint (A) in the region of the housing (B).

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.