Workshop Manuals Factory service & repair Volkswagen
01 4 - Cyl. injection engine (1.0 l)02 5 - Speed manual gearbox 013 and 0CA03 Brake systems04 Running gear, axles, steering05 Running gear, axels, steering - GTI 16V06 Heating, air conditioning07 Electrical system08 Electrical: Communication09 General body repairs, interior10 General body repairs, exterior11 4 - Cyl. injection engine12 4-Cyl. injection engine (1.0 l, 2-valve, rocking rollers)13 4-cyl. injection engine (2-valve)14 4 - Cyl. diesel engine
Volkswagen Gol G3 with Parati and Saveiro, Brazil (1999-2005)06 · Heating, air conditioning
06 · Heating & A/C

Installation

Make
Volkswagen
Model
Gol G3 with Parati and Saveiro, Brazil
Year
1999–2005
Section
Coolant gas loop › Installation
Heating, air conditioningInstallation

Installation

Installation is performed in reverse sequence to the removal, considering the following:

Note

  • When installing a new drier, fill with 30 ml of coolant gas oil.

Replace the sealing rings of the input and output hoses of the drier.

Lubricate the sealing rings with oil before installing the hoses on the drier.

Tighten the fastening screws of the drier connections with 5 Nm.

Tighten the drier arm screw with 10 Nm.

Parts & tools for this job For 1999 Volkswagen Gol

As an Amazon Associate we earn from qualifying purchases.