Workshop Manuals Factory service & repair Volkswagen
01 3 - Cyl. injection engine02 3 - Cyl. injection engine (1.0l, turbocharger)03 Troubleshooting, Mechanical Transmission04 5 - Speed manual gearbox 0DF05 5 - Speed automated transmission 0CT06 Brake systems07 Running gear, axles, steering08 Wheels and Tyres - Specifications09 Heating, air conditioning10 Electrical system11 Electrical: Communication12 General body repairs, interior13 General body repairs, exterior
Volkswagen Brazil-market up! (2014-2021)09 · Heating, air conditioning
09 · Heating & A/C

Refrigerant circuit - assembly overview

Make
Volkswagen
Model
Up! Brazil-market up!
Year
2014–2021
Section
Coolant gas loop › Refrigerant circuit - assembly overview
Heating, air conditioningRefrigerant circuit - assembly overview

Refrigerant circuit - assembly overview

N87-10933
  • Expansion valve
    Remove and install → Chapter.
  • High pressure sensor G65
    Remove and install → Chapter.
  • Service valve on the low pressure side
    Remove and install → Chapter.
  • Service valve on the high pressure side
    Remove and install → Chapter.
  • Condenser
    Remove and install → Chapter.
  • Dryer filter receiver
    Remove and install → Chapter.
  • Air conditioning compressor
    Remove and install → Chapter.
  • Air conditioning magnetic clutch N25
    Remove and install → Chapter.

Parts & tools for this job For 2014 Volkswagen Up!

As an Amazon Associate we earn from qualifying purchases.