Workshop Manuals Factory service & repair Audi
01 Technical data for engines02 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve)03 Fuel supply system, petrol engines04 Front final drive 0D405 7-speed dual clutch gearbox 0BZ06 Brake system07 Running gear, axles, steering08 Heating, air conditioning09 Electrical system10 Electrical: Communication11 General body repairs, interior12 General body repairs, exterior
Audi R8 Mk2 (2015-2023)01 · Technical data for engines
01 · Engine

Procedure

Make
Audi
Model
R8 Mk2
Year
2015–2023
Section
Overview of engines › Procedure
Technical data for enginesProcedure

Procedure

Outer A-pillar already removed ChapterUpper longitudinal member already removed → Chapter

Cutting locations

Separate original joint using spot weld breaker.

A51-11995

Remove remaining material using compact angle grinder.

A51-11996

Replacement parts

  • A-pillar reinforcement
  • Moulded foam insert

Preparing new part

Drill holes for SG plug weld seam, 7 mm ∅ using drill.

A51-11997

Note

  • Moulded foam inserts must be fitted before welding.

Fix new part in position with portal gauge VAS 5007 and portal gauge supplement, Q7 VAS 5007/26.

Weld in inner A-pillar reinforcement using resistance spot welder: RP spot weld seam.

Weld in inner A-pillar reinforcement using shielded arc welding equipment: SG plug weld seam.

A51-11998
Welding in outer A-pillar Chapter

Parts & tools for this job For 2015 Audi R8

As an Amazon Associate we earn from qualifying purchases.