Workshop Manuals Factory service & repair Audi
01 Technical data for engines02 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve)03 Fuel supply system, petrol engines04 Front final drive 0D405 7-speed dual clutch gearbox 0BZ06 Brake system07 Running gear, axles, steering08 Heating, air conditioning09 Electrical system10 Electrical: Communication11 General body repairs, interior12 General body repairs, exterior
Audi R8 Mk2 (2015-2023)01 · Technical data for engines
01 · Engine

Procedure

Make
Audi
Model
R8 Mk2
Year
2015–2023
Section
Overview of engines › Procedure
Technical data for enginesProcedure

Procedure

Cutting locations

Partial renewalA partial renewal is possible using separating cuts (1).

Remove flow-drill screws (3) using socket for flow-drill screws VAS 852 007.

Separate original joint using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

Remove paint and oxide layer from rivet head (2) and attachment point for earth clamps using compact angle grinder or brush grinder VAS 6446.

Using dent removal system VAS 852 001, weld on weld stud VAS 852 001/2 to separate riveted joint.

Pull out weld stud VAS 852 001/2 using compact riveter VAS 6792.

A53-11174

Remove remaining material using compact angle grinder.

A53-11175

Replacement parts

  • Cross panel
  • Solid aluminium rivet 4 x 8 mm
  • Solid aluminium rivet 6 x 10 mm
  • Solid aluminium rivet 6 x 12 mm
  • Pop rivets
  • 2-component epoxy adhesive DA 001 730 A2
  • Cleaning solution D.009.401.04
  • Silicate stone DA.009.800
  • Aluminium primer DA.009.801
  • Applicator D.009.500.25

Preparing new parts

Partial renewalA partial renewal is possible using separating cuts (1).

Drill 7.0 mm ∅ holes for 6.5 mm pop rivets in positions of punch rivets (1) using drill.

A53-11185

Clean bonding surfaces with cleaning solution D.009.401.04.

Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.

Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.

A silicate adhesive layer is formed which ensures long-term durability of the bonded joint. The surface becomes matt.

Apply 2-component epoxy adhesive to entire riveting area using pneumatic glue gun V.A.G 2005 B.

A53-11176

Installing

Match up and fix new part in position.

Check fit relative to adjacent parts.

Position of rivets

Note

  • The following instructions apply to the left side of the vehicle; the procedure for the right side is similar.

A53-11178
  • Solid aluminium rivet 4 x 8 mm
  • Pop rivets 6,5 mm
  • Solid aluminium rivet 6 x 10 mm
  • Solid aluminium rivet 6 x 12 mm

Screw in flow-drill screws (2) using socket for flow-drill screws VAS 852 007.

Drill 7.0 mm ∅ holes for 6.5 mm pop rivets in positions of punch rivets (1) using drill.

Rivet in new part with 6.5 mm pop rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20.

Punch holes for 6 mm solid aluminium rivet in positions of punch rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790.

Punch holes for 4 x 8 mm solid aluminium rivet in positions of punch rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790.

Rivet in new part using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

Partial renewalPlace weld pool backing plate of same material behind separating cuts.Weld separating cut using shielded arc welding equipment VAS 6388: SG stepped seam (stitch weld).
A53-11177

Allocation of pop rivets

Replacement partPanel thickness that can be riveted
Pop rivet N.911.033.012 - 4 mm
Pop rivet WHT.005.6973 - 4.8 mm
Pop rivet N.106.414.015 - 9 mm

Parts & tools for this job For 2015 Audi R8

As an Amazon Associate we earn from qualifying purchases.