Remove paint and oxide layer from rivet head and attachment point for earth clamps using compact angle grinder or brush grinder VAS 6446.
Weld on weld stud 852 001/1 using dent removal system VAS 852 001 approved by AUDI AG.
Pull out weld stud VAS 852 001/2 using compact riveter VAS 6792.
Make separating cut (1) according to dimension (a) using body saw.
Make separating cuts (2) and (3) as shown using body saw.
Drill out original joint using spot weld breaker.

Grind through flange area using compact angle grinder.

Remove remaining material using compact angle grinder.

- B-pillar (sub-part)
- Moulded foam inserts
- Filler foam D 506 KD1 A3
- 2-component epoxy adhesive DA 180 A00 A2
- Punch rivet N 912 295 02
- Silicate stone DA.009.800
- Aluminium primer DA.009.801
- Applicator D.009.500.25
- Cleaning solution D.009.401.04
Transfer separating cuts to new part and cut to size using body saw.
Roughen bonding surface using a clean sanding disc (grit size P 80 or P 100).
Clean new part with cleaning solution D.009.401.04.

Warning Pre-treatment applies to old flange only.
Use clean brush to remove sanding dust.
Clean bonding surfaces with cleaning solution D.009.401.04.
Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.
Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.
Apply 2-component epoxy adhesive DA 180 A00 A2 to entire riveting area using double cartridge gun VAS 6453.
Note
- Moulded foam inserts must be fitted before welding.
Rivet in B-pillar using rechargeable riveter VAS 843 001 or compact booster VAS 6790 and attachment S6 and S7 for punch rivet N 912 295 02.
Weld in B-pillar using resistance spot welder: RP spot weld seam.

Weld separating cuts (a) using shielded arc welding equipment VAS 6388: SG continuous seam.
Weld separating cuts (b) using shielded arc welding equipment VAS 6044 or VAS 6045: SG continuous seam.
Do not make welds in aluminium/steel transition areas; seal cutting point with 2-component epoxy adhesive DA 180 A00 A2.
Seal off wet area additionally with polyurethane sealant AKD.476.KD5.05 (note painting requirements).

Fold flange over. Wipe off emerging adhesive and seal joint.

Parts & tools for this job For 2015 Audi R8
- PARTEngine gasket setSearch: Audi R8 2015 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.