Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Body - roof and headlining12 Body shell13 Lighting and signalling14 Wipers and washers15 Fascia and interior panels16 Front seats17 Rear seats18 Interior trim19 Electrical - general20 Starting and charging21 Instruments and warning lamps22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën C2 Factory Workshop Manual (2003-2009)01 · Engine
01 · Engine

Removing - refitting: Engine - gearbox

Make
Citroën
Model
C2 Factory Workshop Manual
Year
2003–2009
Section
Engine assembly › Removing - refitting: Engine - gearbox
EngineRemoving - refitting: Engine - gearbox

Removing - refitting: Engine - gearbox

Citroën C2 · Removal-fitting · Ref. B1BG010UP0

Applies to: Bosch injection and 1.6 HDi 110 particle emission filter (DV6TED4)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

Figure e5ap2xsd

[1] lifting bench 5702-T.A.

Figure e5ap38fd

[2] pliers for removing and refitting hose clips 9029-T.

Figure e5ap2x7d

[3] plugs kit (-).0194/2-E.

Figure e5ap3rqd

[4] set of retaining supports 5704-T.

[5] Power train / lifting table connection pin 5704-T.

Figure e5ap38rd

[6] set of two hose clamps 4153-T.

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Chock and raise the vehicle on a 2 column lift.

Slacken the front wheel bolts.

Lift and support the vehicle.

Figure b1bm0d6d

Remove:

  • The ancillaries battery cover
  • The engine cover

Disconnect the ancillaries battery.

Drain the cooling system.

Raise the vehicle   (at mid-height).

Remove:

Raise the vehicle.

Partially remove the exhaust pipe by disconnecting the catalytic converter.

Release the exhaust pipe.

Uncouple and close:

  • The venting hoses (5)
  • The radiator top hose
  • The exchanger outlet hose (4)
  • The exchanger inlet hose (3)

2.1. Vehicle with air conditioning

Figure b1bm0d7d

Disconnect the connectors at "a".

Remove:

  • The 3 bolts (6)
  • The air-conditioning compressor (7)

Suspend the air conditioning compressor on the left-hand side of the vehicle.

2.2. Removing   (continued)

Uncouple and close:

  • The pipe (8)
  • The bottom hose of the cooling radiator

Lower the vehicle close to ground-level.

Remove the earth lead fixed to the gearbox.

Unplug:

  • The engine harness
  • The positive harness   (engine fusebox)
  • The earth lead   (in the wheelarch)

Uncouple:

  • The heater matrix inlet and outlet hoses
  • The fuel pipes
  • The expansion bottle venting hose
  • The braking assistance pipe
Figure b1gm02ld

Remove:

  • The connectors of the cooling fan (9)
  • The 3 wiring harnesses on the pre-postheating unit   (in the wheelarch)
  • The fan unit (9)
  • The 2 screws of the hydraulic clutch control (10)
  • The bumper crossmember

Disconnect the clutch control (10).

Move aside and clamp the air conditioning condenser   (according to equipment).

Remove:

Figure b2cm02hd

Uncouple the rods (11).

Remove:

  • The bolts (12), (15)
  • The nut (14)
  • The bracket (13)

Move the mounting (13) aside.

Position the vehicle at a height of 60 cm.

Figure b1bm0d8d

Position the lifting table [1] and the supports [4]   (under the engine/gearbox assembly).

Fix the intermediate mounting [4a] onto the right hand drive shaft bearing   (at "b").

Figure b1bm0d9d

Fix the tool [4b] on the air conditioning compressor support   (at "c").

Fit the tool [4c] on the blind hole on the gearbox   (at "e").

Fitthe tool [5] in the blind hole on the cylinder block   (at "d").

Tighten all of the fixings of the supports [4], [5].

Lift the engine-gearbox assembly slightly; Using the lifting table [1].

Mark the location of the lifting table [1] on the ground.

Figure b1bm0dad

Remove:

  • The 3 bolts (16)
  • The 2 bolts (17)

Lower the power unit assembly; Using the lifting table [1].

CAUTION: Make sure that there is no contact between the power unit and the body.

Raise the vehicle.

3. Refitting

Raise the vehicle.

Position:

  • The lifting bench [1] under the vehicle   (to the marks made during removal)
  • The vehicle has a height of 50 cm

Fit the engine/gearbox assembly; Using tool [3].

CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell. If necessary move the engine-gearbox assembly to facilitate its repositioning.

Figure b1bm0dad

CAUTION: Respect the torque figures.

Refit:

  • The 2 bolts (17); Tighten to 6 daN.m
  • The 3 bolts (16); Tighten to 6 daN.m

3.1. Vehicle with air conditioning

Reposition the air conditioning compressor (7).

Refit the 3 bolts (6); Tighten to 2,4 daN.m.

Reconnect the connectors at "a".

3.2. Refitting   (continued)

Refit:

  • The bracket (13)
  • The nut (14); Tighten to 1,3 daN.m
  • The bolts (12), (15); Tighten to 1,9 daN.m

Couple up:

  • The rods (11)
  • The hydraulic clutch control (10)

Refit:

  • The cooling box
  • The turbocharging air cooler ()
  • The bonnet opening cable ()
  • The air conditioning capacitor (According to equipment)
  • The bumper crossmember
  • The 2 screws of the hydraulic clutch control (10)
  • The fan unit (9)

Reconnect:

  • The connectors of the cooling fan (9)
  • The 3 wiring harnesses on the pre-postheating unit   (in the wheelarch)
  • The earth wire on the gearbox

Couple up:

  • The pipe (8)
  • The radiator top hose
  • The exchanger outlet hose (4)
  • The exchanger inlet hose (3)

Lower the vehicle close to ground-level.

Refit the earth wire on the chassis member.

Couple up:

  • The heater matrix inlet and outlet hoses
  • The bottom hose of the cooling radiator
  • The venting hoses (5)

Reconnect:

  • The engine harness
  • The positive harness   (engine fusebox)
  • The earth lead   (in the wheelarch)

Couple up:

  • The fuel pipes
  • The braking assistance pipe

Raise the vehicle.

Refit:

Fill and bleed the cooling system.

Reconnect the ancillaries battery.

CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.

Refit:

  • The ancillaries battery cover
  • The engine cover

Return the vehicle to its wheels.

Tighten the wheel bolts.

Check the functioning of the air conditioning.

Carry out:

  • A road test
  • A reading of the diagnostic memories

Parts & tools for this job For 2003 Citroën C2

As an Amazon Associate we earn from qualifying purchases.