Removing - refitting: Engine/gearbox assembly (TU1A/TU3A)
- Make
- Citroën
- Model
- C2 Factory Workshop Manual
- Year
- 2003–2009
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (TU1A/TU3A)
Removing - refitting: Engine/gearbox assembly (TU1A/TU3A)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] lifting bench 5702-T.A.
[2] engine support 5704-T.
[3] pliers for removing and refitting hose clips 9029-T.
[4] union for venting fuel pressure 4192-T.
[5] hub immobilising tool 6310-T.
2. Removing
Lift and support the vehicle with front wheels suspended.
Disconnect the battery.
Remove:
- The front wheels
- The front right mud guard
- The auxiliary equipment drive belt (see the relevant operation)
- The driveshaft nuts Using tool [5]
- The lower ball joints fixing nuts
- The drive shafts
Drain:
- The gearbox
- The cooling system
CAUTION: When connecting the tool [4], protect yourself with a cloth to guard against any projections of fuel.
The wiper arm nut (4).
Remove:
- The air filter assembly (4)
- The ECU (5)
- The battery (6) and its bracket
Uncouple:
- The pipe (3)
- The canister electrovalve (1)
- Accelerator cable (2) (according to model)
- The fuel delivery hose
Disconnect the connectors, then unclip and move aside the electrical harnesses adjacent to the engine.
Uncouple the unions, then detach and move aside the pipes adjacent to the engine.
Remove:
- Bonnet locking (7)
- The engine cooling radiator, Using tool [3]
Remove the circlips (8).
Uncouple:
- The hoses from the heater housing (9)
- The braking assistance pipe
- The hydraulic clutch control cylinder
Uncouple:
- The gearbox control rods
- The gear control cables
- The earth cable
Remove:
- The securing bolts (10)
- The reaction link (11)
- The exhaust pipe (12)
- The exhaust manifold
- The alternator harness protection sleeve
- The alternator
Uncouple the air conditioning compressor (according to equipment).
Put lifting table [1] together with its supports [2] in position under the engine.
Clamp the engine-gearbox assembly using tools [1] and [2].
Remove:
- The bolts (13)
- The bolts (14)
- The power unit assembly
Gently lower the engine-gearbox assembly with the lifting bench.
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.
3. Refitting
Raise the vehicle.
Fit the engine/gearbox assembly, Using tools [1] and [2].
Refit:
- The power unit assembly
- The engine mounting fixing screws
Disengage the tools [1] and [2].
Tighten the engine mounting brackets (see the relevant operation).
Refit:
- The reaction link
- The catalytic converter
- The air-conditioning compressor
- The accessories drive belt (see the relevant operation)
- The exhaust manifold
Couple up:
- The click-fit pipes of the heater assembly
- The hydraulic clutch control cylinder
- The fuel delivery hose
Clip the gear control cables on the gearbox.
Refit:
- The exhaust clip
- The drive shafts (see the relevant operation)
- The front splash shields
- The front wheels
Fill gearbox with oil and ensure correct level (see the relevant operation).
Fill and bleed the engine cooling circuit (see the relevant operation).
Check all the levels.
Always fit new Nylstop nuts.
Parts & tools for this job For 2003 Citroën C2
- PARTEngine gasket setSearch: Citroën C2 2003 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.