Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Body - roof and headlining12 Body shell13 Lighting and signalling14 Wipers and washers15 Fascia and interior panels16 Front seats17 Rear seats18 Interior trim19 Electrical - general20 Starting and charging21 Instruments and warning lamps22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën C2 Factory Workshop Manual (2003-2009)01 · Engine
01 · Engine

Removing - refitting: Power unit

Make
Citroën
Model
C2 Factory Workshop Manual
Year
2003–2009
Section
Engine assembly › Removing - refitting: Power unit
EngineRemoving - refitting: Power unit

Removing - refitting: Power unit

Citroën C2 · Removal-fitting · Ref. B1BG65P0

Applies to: 1.4 HDi 70

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p01sc

[1] hub immobilising tool 6310-T.

Figure e5-p129c

[2] pivot ball-joint uncoupling lever 9509-T.

Figure e5ap1urc

[3] pliers for removing and refitting hose clips 9029-T.

Figure e5ap21pc

[4] pliers to remove "clic" clips (-).0172.Z.

Figure e5ap1gwc

[5] lifting bench 5702-T.A.

Figure e5ap1tkc

[6] engine supports 5704-T.

Figure e5ap1hac

[7] final drive right-hand output oil seal fitting drift 7114-T.X (addition to tool box 7116-T).

Figure e5ap21qc

[8] final drive left-hand output oil seal fitting drift 7114-T.W (addition to tool box 7116-T).

2. Removing

Disconnect the battery.

Raise the vehicle and support on axle stands, wheels free.

Remove the front wheels.

Remove the drive shafts (see the relevant operation).

Drain the cooling system (see the relevant operation).

Drain the gearbox (see the relevant operation).

Remove the front bumper (see the relevant operation).

Figure b1bp2yec

Remove the screws fixing the air duct on the integrated air manifold.

Remove the air conduit (3).

Remove the battery.

Disconnect the 3 connectors of the injection ECU (take care when handling the special connectors).

Remove:

  • The injection ECU (2)
  • The separator between the battery and the electric power steering ECU

Disconnect the 3 connectors of the electric power steering ECU.

Remove:

  • The electric power steering ECU (1)
  • The 2 battery mounting fixing screws
  • The battery support

Remove: The 2 fixing screws from each side of the radiator/cooling fan assembly mounting.

Uncouple the 2 hoses from the radiator.

Disconnect the expansion chamber return tube from the radiator.

Remove the fan assembly and the radiator.

Figure d4ap055c

Fuse box.

Unplug:

  • The connector (4)
  • The black 2 (5) -way connector
  • The nut (6) fixing the 3 earth wires

Remove the pre- and post-heating control unit (under the wing and the front RH headlamp).

Figure b2bp05mc

Remove the bolts (7).

Move aside the clutch slave cylinder (8) without opening the hydraulic circuit.

Figure b1bp2yfc

Uncouple the click-fit unions of the fuel supply and return pipes (9).

Under the vehicle.

Uncouple:

  • The clip fixing the exhaust line close to the rubber pipe
  • The torque reaction rod mounting (engine side)
Figure b2cp3svc

Uncouple:

  • The ball joint (12)
  • The ball joint (13)

N.B.: Press on the lugs on each side and lever under the ball-joint.

Uncouple:

  • The cable end stop (10) (pull on the locking pin)
  • The cable end stop (11) (pull on the locking pin)
  • The coolant housing inlet hose

Put lifting table [5] together with its supports [6] in position under the engine.

Figure b2cp3swc

Remove the 2 bolts (14).

Figure b1bp2ygc

Remove:

  • The 3 bolts (16)
  • The 2 bolts (17)
  • The right-hand engine mounting (15)

Remove the power unit assembly from under the vehicle.

N.B.: Mark the location of the lifting table on the ground.

3. Refitting

Position the lifting bench [5] with the engine-gearbox assembly at the marks made at removal.

Proceed in the reverse order to removal.

N.B.: Always fit new Nylstop nuts.

Figure b2cp3gnd

Replace the final drive output lip seals with the aid of mandrels [7] and [8], having greased between the lips.

Fit the engine/gearbox assembly.

Refit:

  • The right-hand engine mounting (15)
  • The screws (16) and (17)
  • The bolts (14)
  • The reaction link
  • The exhaust

Connect and clip the hoses, harnesses and cables connected to the power unit.

Refit:

  • The drive shafts (see the relevant operation)
  • The battery

Refit the air duct.

Fill and top up the level of the following of the following elements:

  • Gearbox
  • Cooling system

Bleed the cooling system (see the relevant operation).

Return the vehicle to its wheels.

ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).

Parts & tools for this job For 2003 Citroën C2

As an Amazon Associate we earn from qualifying purchases.