Removing - refitting: Engine and gearbox assembly
- Make
- Citroën
- Model
- C5 II Factory Workshop Manual
- Year
- 2004–2008
- Section
- Engine assembly › Removing - refitting: Engine and gearbox assembly
Removing - refitting: Engine and gearbox assembly
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] Pliers for removing elastic clips 9029-T.
[2] pliers to remove "clic" clips (-).0172.Z.
[3] lifting bench 5702-T.A.
[4a] engine support 5704-T.
[4b] engine support 5704-T.
[5] Set of hose clamps 0 to 26 mm dia. 4153-T.
[6] plugs kit (-).0194.T.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Place the vehicle on a 2-post lift.
Slacken the front wheel bolts.
Remove the engine covers.
Disconnect the battery negative terminal.
Drain:
- The cooling system (see the relevant operation)
- The gearbox
Disconnect, blank off and move aside (blank the apertures using tool [6]):
- Pipes (1) and (2)
- The tube (8)
- The tube (9)
- The radiator venting hose (7) Using tool [1]
Uncouple:
- The air duct (4)
- The air duct (6)
Remove:
- The lid of the engine compartment fusebox
- The (5) bolt
- The air filter housing assembly (3) (see the relevant operation)
Remove the bolts (10).
Move aside the clutch slave cylinder (11) without opening the hydraulic circuit.
Unclip and move aside the relay unit.
N.B.: Mark the direction of fitting of the clamping collars (12).
Loosen the clips (12).
Uncouple:
- The air ducts (14) and (16)
- The pipes on the EGR electrovalve (mark the locations of the pipes on the EGR electrovalve)
- The vacuum pipe of the braking servo
- The click-fit pipes of the heater assembly
Remove:
- The pipe (16)
- The pre-heater unit
- The injection ECU and its support
- The 2 bolts (13)
- The pipes union (15)
Unplug:
- The negative electric cable on the body
- The positive electric cable
- The engine harness connectors in the engine compartment fusebox
Place a hose clamp [5] on the tube (8).
Remove:
- The (18) bolt
- The clip (21) Using tool [2]
- The (17) bolt (recover the 2 seals)
N.B.: Slacken the power steering fluid reservoir cap to lower the pressure in the circuit.
Disconnect, blank off and move aside:
- The high pressure tube (19)
- The pipe (20)
Remove:
- The 3 bolts (22)
- The pipes union (15) support
- The (23) bolt
- The particle filter pressure sensor and support assembly
Unclip the engine cooling radiator at "a".
Remove the engine cooling radiator.
2.1. Vehicle with air conditioning
Support the air conditioning condenser on the vehicle body.
Disconnect the air conditioning compressor connectors.
Remove:
- The accessories drive belt (32) (see the relevant operation)
- The bolts (24)
- The air-conditioning compressor (25)
Hang the air conditioning compressor (25) on the vehicle body.
2.2. Vehicles all types
Uncouple the pipe (30).
Remove:
- The stabiliser bar (28)
- The lower torque reaction rod bolt (29)
- The fixings of the power steering pipes (27) and (30) on the engine subframe
- The drive shafts (see the relevant operation)
- The exhaust hose (26)
Move aside the power steering pipes (27) and (30).
Uncouple the gear control lever ball joints.
Position the bottom of the front bumper at 85 cm from the ground.
Centre the lifting bench [3] beneath the engine.
Lift the elevating platform [3].
Secure the engine-gearbox assembly using tool [4] in the following way:
- Clutch end for vehicles with and without air conditioning: One tool [4a] in the recess in the bearing cap cover and another tool [4a] positioned between the LH gearbox output and the bearing cap cover
- Clutch end for vehicles with air conditioning: One tool [4a] in the recess in the bearing cap cover and tool [4b] fixed on one of the air conditioning compressor fixings
- Clutch end for vehicles without air conditioning: Tool [4b] fixed on the bearing of the LH driveshaft and one tool [4a] under the oil sump fixing edge
- Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress
Slacken the bolt (37).
Remove:
- The (33) bolt
- The nut (35)
- The 3 bolts (34)
- The RH engine mounting (36) and upper torque reaction rod (38) assembly
- The 2 bolts (39)
Lower the power unit assembly.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Raise the vehicle.
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Position the lifting bench [3] with the engine-gearbox assembly at the marks made at removal.
Carefully lower the vehicle.
Position the front bumper 85 cm from the ground.
Lift the elevating platform.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Refit:
- The 2 bolts (39) Tighten to 5,5 ± 0,8 daN.m
- The RH engine mounting (36) and upper torque reaction rod (38) assembly
- The nut (35) Tighten to 4,5 ± 0,5 daN.m
- The 3 bolts (34) Tighten to 5,5 ± 0,8 daN.m
- The (33) bolt Tighten to 6 ± 0,6 daN.m
- The (37) bolt Tighten to 6 ± 0,6 daN.m
Disengage the lifting bench [3].
3.1. Vehicle with air conditioning
Unclamp the air conditioning compressor (25).
Refit:
- The air-conditioning compressor (25)
- The bolts (24) Tighten to 4 ± 0,5 daN.m
- The accessories drive belt (32) (see the relevant operation)
3.2. Vehicles all types
Refit:
- The exhaust hose (26)
- The lower torque reaction rod bolt (29) Tighten to 6 ± 0,6 daN.m
- The fixings of the power steering pipes (27) and (30) on the engine subframe
- The stabiliser bar (28)
Couple up:
- The high pressure tube (19)
- The pipe (20)
Refit:
- The (17) bolt (refit the 2 seals) Tighten to 4,6 ± 0,6 daN.m
- The clip (21) Using tool [2]
- The (18) bolt
Tighten the power steering fluid reservoir cap.
Remove the hose clamp [5].
Refit:
- The engine cooling radiator
- The particle filter pressure sensor and support assembly
- The (23) bolt
- The pipes union (15) support
- The 3 bolts (22)
Refit:
- The pipes union (15)
- The pipe (16)
- The 2 bolts (13)
- The clips (12)
Connect the cooling radiator bottom hose.
Lower the vehicle to the ground.
Couple up:
- The click-fit pipes of the heater assembly (new seals)
- The vacuum pipe of the braking servo
Position and clip the relay unit.
Reposition the clutch slave cylinder (11).
Refit the bolts (10).
Connect:
- The engine harness connectors in the engine compartment fusebox
- The positive electric cable
- The negative electric cable on the body
Refit:
- The injection ECU and its support
- The pre-heater unit
- The air filter housing assembly (3) (see the relevant operation)
- The air ducts (4) and (6)
- The lid of the engine compartment fusebox
Couple up:
- The venting hose (7) Using tool [1]
- The tube (8)
- The tube (9)
- The tube (2)
- The tube (1)
Couple the gear control lever ball joints.
Connect the hose (31).
Fill gearbox with oil and ensure correct level.
Fill, bleed and top up the level of the cooling circuit.
Tighten:
- The drive shafts (see the relevant operation)
- The wheels Tighten to 9 ± 0,5 daN.m
Check the steering fluid level.
Top up the engine oil.
Reconnect the battery negative terminal.
ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).
3.3. Vehicle with air conditioning
Check that the air conditioning system works properly.
3.4. Vehicles all types
Carry out:
- A road test
- A reading of the auto-diagnostic memories
Parts & tools for this job For 2004 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2004 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.