Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C5 II Factory Workshop Manual (2004-2008)01 · Engine
01 · Engine

Removing - refitting: Engine/gearbox assembly (EW7J4)

Make
Citroën
Model
C5 II Factory Workshop Manual
Year
2004–2008
Section
Engine assembly › Removing - refitting: Engine/gearbox assembly (EW7J4)
EngineRemoving - refitting: Engine/gearbox assembly (EW7J4)

Removing - refitting: Engine/gearbox assembly (EW7J4)

Citroën C5 II · Removal-fitting · Ref. B1BG6SP0

Applies to: 1.8 i 16v 117

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5ap1t2c

[1] union for venting fuel pressure 4192-T.

Figure e5-p12cc

[2] hub immobilising tool 6310-T.

Figure b1bp032c

[3]   lifting bench 5702-T.A.

Figure e5ap1gvc

[4a]   Engine mounting with reversible tool 5704-T.

[4b] engine supports 5704-T.

Figure e5ap1u2c

[3] lifting table plus accessories [4a] and [4b] - (tool [4a] is not represented).

Additional tools:

  • Pliers for removing "CLIC" clips 4145-T
  • Pliers for cooling hose clips (9029-T)
  • Filling cylinder 4520-T
  • Filling cylinder adaptor 4222-T

2. Removing

Raise and support the vehicle on a 2 -post lift.

Disconnect the battery positive and negative terminals.

Remove:

  • The front wheels
  • The front right and left hand splashshields

Release the drive shaft nuts.

Drain:

  • The gearbox   (except automatic gearbox)
  • The cooling system   (see the relevant operation)
Figure b1bp352d

Remove:

  • The air inlet sleeve
  • The engine cover
  • The battery style cover
  • The battery
  • The battery support
  • The duct (1) with the air filter assembly

Uncouple:

  • The braking servo pipe from the butterfly housing
  • The 2 gear control cables

Place the tool [1] on the valve (2) to drop the pressure of the fuel supply circuit.

N.B.: Place a cloth to protect yourself against any projections of fuel.

Disconnect and blank the fuel delivery click-fit hose.

Disconnect the connectors of the following components:

  • The engine ecu
  • The connector at "a"
  • The motorised butterfly housing
  • The petrol injectors

Remove:

  • The cable support screws
  • The air intake manifold (3)
  • The cooling radiator
  • The clutch slave cylinder
Figure b1bp2bud

Uncouple:

  • The click-fit pipes of the heater assembly (4)
  • The bottom and top hoses from the coolant outlet housing (5)

Disconnect the connectors from the following components:

  • The alternator
  • The starter motor
  • The knock sensor
  • The power steering pressure sensor
  • The engine coolant temperature sensor

Disengage the electric engine harness (6).

Remove the accessories drive belt   (see the relevant operation).

Disconnect the air con compressor.

Remove the air conditioning compressor and fix it to a bodywork component.

Protect the cooling condenser with cardboard.

Fit a hose clamp, at "b", on the vacuum pipe (8) of the power steering pump.

Disconnect and plug the power steering return tube (8).

Figure b2cp3dzd

Fit a hose clamp at "c".

Disconnect, blank off and move aside: The hose (9) of the power steering pump return tube.

Remove:

  • The bolts (10)
  • The drive shafts; Using tool [2]   (see the relevant operation)
  • The exhaust clip
  • The reaction link

Place the vehicle at a height of 50 cm from the ground.

Position the lifting table [3] with its pivoting platform, underneath the engine-gearbox assembly via the front of the vehicle.

Lift the elevating platform [3].

Clamp the engine-gearbox assembly using tools [4a] and [4b].

The tools [4b] in the recess holes of the cylinder block.

The tool [4a] on the lower torque reaction rod.

Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.

Figure b1bp2bvc

Remove:

  • The upper torque reaction link (11)
  • The 3 bolts (12)

Remove the screw (13) from the cylinder head.

Figure b2cp3yyc

Remove the 2 bolts (14).

Figure b1bp353d

Bring the engine-gearbox assembly as far forward as possible towards the front of the vehicle.

Slowly lower the lifting table [3].

Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.

Manoevre the engine-gearbox assembly to facilitate removal.

Raise the vehicle.

Mark the location of the lifting table on the ground.

Move the engine-gearbox assembly away from under the vehicle.

3. Refitting

Raise the vehicle.

Position:

  • The lifting table under the vehicle   (to the marks made during removal)
  • The vehicle has a height of 50 cm

Lift the elevating platform [3].

CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell. Manoevre the engine-gearbox assembly to facilitate its repositioning.

Reposition the engine-gearbox assembly opposite its upper fixings.

Refit:

  • The 3 bolts (14), Tighten to 4,5 ± 0,5 daN.m
  • Upper right-hand engine support
  • The 3 bolts (12), Tighten to 6,1 ± 0,6 daN.m
  • The upper torque reaction link (11)
  • Withdraw the lifting table from under the vehicle
  • The air-conditioning compressor
  • The accessories drive belt   (see the relevant operation)

Remove the the protective card from the air conditioning condenser.

Refit the radiator   (see the relevant operation).

Couple up:

  • The heater matrix inlet and outlet hoses
  • The hoses of the coolant outlet housing
  • The clutch slave cylinder

Connect the engine harnesses to the petrol injectors, alternator, starter motor and sensors.

Refit:

  • The power steering pressure tube
  • The power steering return tube
  • The power steering pump supply hose

Remove the hose clamps at "b" and "c".

Fit the gearbox control cable support.

Clip the gear control cables on the gearbox.

Refit:

  • The lower torque reaction link
  • The exhaust clip
  • The drive shafts   (see the relevant operation)
  • The front right and left hand splashshields
  • The front wheels
  • The air intake manifold (/)
  • The fuel delivery hose
  • The battery support
  • The vehicle’s battery
  • The air cleaner

Reposition and recouple the vacuum tubes on the various components   (respect the marks made at the time of removal).

Reconnect the battery.

Fill gearbox with oil and ensure correct level.

Fill and bleed the engine cooling circuit   (see the relevant operation).

Check the levels.

Refit:

  • The engine cover
  • The battery style cover

Lower the vehicle to the ground.

Tighten the wheel bolts.

Check that the air-conditioning is working correctly   (according to equipment).

Carry out:

  • A road test
  • A reading of the diagnostic memories

Parts & tools for this job For 2004 Citroën C5

As an Amazon Associate we earn from qualifying purchases.