Removing - refitting: Power unit (DW12TED4)
- Make
- Citroën
- Model
- C5 II Factory Workshop Manual
- Year
- 2004–2008
- Section
- Engine assembly › Removing - refitting: Power unit (DW12TED4)
Removing - refitting: Power unit (DW12TED4)
ESSENTIAL: Observe the safety and cleanliness recommendations (refer to the brochure: RECOMMENDATIONS - PRECAUTIONS).
1. Recommended tools
[1] hub immobilising tool 6310-T.
[2] pliers for removing and refitting hose clips 9029-T.
[3] lifting bench 5702-T.A.
[4a] Engine mounting with reversible tool 5704-T.
[4b] engine support 5704-T.
[4] lifting table plus accessories [4a] and [4b] (tool [4a] is not represented).
[5] set of two hose clamps 4153-T.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Place the vehicle on a 2-post lift.
Slacken the front wheel bolts.
Lift and support the vehicle.
Remove:
- The engine covers
- The battery style cover
Disconnect the battery negative terminal.
Drain:
- The engine cooling system (see the relevant operation)
- The gearbox (manual gearbox) (see the relevant operation)
Disconnect connector of the air flowmeter.
Remove:
- The cover (5)
- The air filter (6) with the air flow sensor
- The turbocompressor air inlet duct (4)
Mark, disconnect and move aside the vacuum control tubes (3).
Remove:
- The air ducts (1) and (9)
- The water/air heat exchanger
- The hoses (7) and (8) Using tool [2]
- The radiator (2)
- The front wheels
- The front splash shields (see the relevant operation)
- The drive shafts; Using tool [1] (see the relevant operation)
Remove:
- The pipe (10)
- The lower torque reaction link (11)
N.B.: Mark the hoses (13) and (14).
Uncouple:
- The pipe (13)
- The pipe (14)
Remove:
- The exhaust flexible joint (15), catalytic converter and particle filter assembly
- The gearbox control support fixings (12)
Unclip and move aside the gearbox control cables with the support (12) (see the relevant operation).
Fit a hose clamp [5].
Uncouple and plug the tube (16).
Fit a hose clamp [5].
Disconnect, blank off and move aside:
- The pipe (18)
- The tube (17)
- The fuel delivery hose (19)
- The fuel return hose (20)
Remove the expansion chamber (21).
Remove:
- The injection ECU (26)
- The pre-heater unit
Unplug:
- The engine harness of the BSI (27)
- The earth lead (28)
Fold back and clamp the engine harness on the engine.
Uncouple:
- The clutch slave cylinder (22)
- The hoses (23) and (24) (additional heating according to equipment)
- The vacuum tubes and the electrovalve connectors
- The heater matrix inlet and outlet hoses (25)
CAUTION: Mark the connectors and tubes on the electrovalves.
Disconnect the earth wire on the gearbox.
2.1. Vehicle with air conditioning
Disconnect the connector (29).
Remove:
- The accessories drive belt (see the relevant operation)
- The guide roller of the accessories drive belt
- The 2 mountings (30)
- The 2 mountings (32)
Hang the air conditioning compressor (31) from the vehicle body.
Protect the cooling condenser with cardboard.
2.2. Removing (continued)
Position the vehicle at a height of 50 cm.
Centralise the lifting table 3 under the engine/gearbox assembly.
Lift the elevating platform [3].
Clamp the engine-gearbox assembly using tools [4a] and [4b].
N.B.: Position the tools [4b] in the recessed holes in the cylinder block.
N.B.: Position the tool [4a] on the lower torque reaction rod.
Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.
Remove:
- The upper torque reaction link (35)
- The bolts (36)
- The nut (33)
- The right-hand engine mounting (34)
Remove the 3 bolts (37).
Bring the engine-gearbox assembly as far forward as possible towards the front of the vehicle.
Gently lower the engine-gearbox assembly with the lifting bench.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Manoevre the engine-gearbox assembly to facilitate removal.
Raise the vehicle.
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Raise the vehicle.
Position:
- The lifting table under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Lift the elevating platform [3].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body. If necessary move the engine-gearbox assembly to facilitate its repositioning.
Reposition the engine-gearbox assembly opposite its upper fixings.
Refit:
- The 3 bolts (37) Tighten to 4,5 ± 0,5 daN.m
- The engine mounting (34)
- The 3 bolts (36) Tighten to 6,1 ± 0,6 daN.m
- The nut (33) Tighten to 4,5 ± 0,5 daN.m
- The upper torque reaction link (35)
Take away the lifting table [3].
3.1. Vehicle with air conditioning
Reposition the air conditioning compressor.
Refit:
- The 2 mountings (32)
- The 2 mountings (30)
- The guide roller of the accessories drive belt
- The accessories drive belt (see the relevant operation)
Reconnect the connector (29).
Remove the protective card.
3.2. Refitting (continued)
Reconnect the earth wire on the gearbox.
Couple up:
- The vacuum tubes and the electrovalve connectors (respect the marks made on removal)
- The hoses (23) and (24) (additional heating according to equipment)
- The clutch slave cylinder (22)
- The heater matrix inlet and outlet hoses (25)
Unclamp and reposition the engine harness.
Reconnect:
- The engine harness on the BSI (27)
- The earth lead (28)
Refit:
- The pre-heater unit
- The injection ECU (26)
- The expansion bottle (21)
Reposition and reconnect:
- The fuel delivery hose (19)
- The fuel return hose (20)
- The tube (17)
- The tube (16)
- The pipe (18)
Remove the tools [5].
Reposition and attach the gearbox control support (12).
Reclip the gearbox control cables on the gearbox.
Refit the exhaust flexible joint (15), catalytic converter and particle filter assembly.
Couple the pipes (13) and (14) (respect the marks made on removal).
Refit:
- The lower torque reaction link (11)
- The pipe (10)
- The drive shafts (see the relevant operation)
- The front splash shields (see the relevant operation)
- The front wheels
- The radiator (2)
- The hoses (7) and (8)
- The water/air heat exchanger
- The air ducts (1) and (9)
- The turbocompressor air inlet duct (4)
Position and connect the vacuum control tubes (3) on the various components (respect the marks made on removal).
Refit:
- The air filter (6) with the air flow sensor
- The cover (5)
Reconnect the connector on the air flow meter.
Reconnect the battery negative terminal.
Fill and top up the gearbox oil (manual gearbox) (see the relevant operation).
Fill and bleed the cooling system (see the relevant operation).
Check the hydraulic fluid level.
Refit:
- The battery style cover
- The engine covers
Return the vehicle to its wheels.
Check that the air-conditioning is working correctly.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2004 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2004 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.