Removing - refitting: Power unit (ES9A)
- Make
- Citroën
- Model
- C5 II Factory Workshop Manual
- Year
- 2004–2008
- Section
- Engine assembly › Removing - refitting: Power unit (ES9A)
Removing - refitting: Power unit (ES9A)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] pliers for removing and refitting hose clips 9029-T.
[2] union for venting fuel pressure 4192-T.
[3] pliers to remove "clic" clips (-).0172.Z.
[4] hose clamp 4153-T.
[5] lifting bench 5702-T.A.
[6] engine supports 5704-T.
[7] plugs kit (-).0188.T.
[8] ball-joint extractor (-).0338.E.
2. Removing
Place the vehicle on a 2-post lift.
Slacken the front wheel bolts.
Lift and support the vehicle.
Remove the covers (1), (2), (3) and (4).
Disconnect the battery positive and negative terminals.
Drain the cooling circuit with the engine cold (see the relevant operation).
Raise the vehicle (at mid-height).
Remove:
- The front wheels
- The front splash shields (see the relevant operation)
- The drive shafts (see the relevant operation)
Raise the vehicle.
Remove the engine subframe (see the relevant operation).
Disconnect the connector (6).
Remove:
- The exhaust/pre-catalyst manifold link bracket (at "a")
- The clip (8)
- The bracket (7)
- The pre-catalytic converter (5) (fitted with its gasket)
Disconnect the air conditioning compressor connector.
Remove:
- The accessories drive belt (see the relevant operation)
- The 4 mountings (10)
- The power steering pump pulley
Suspend the air conditioning compressor on the left-hand side of the vehicle.
Uncouple and close:
- The pipe (9) Using tools [1] and [7]
- The pipe (11) Using tools [1] and [7]
- The heat exchanger flexible hoses (automatic gearbox)
Remove:
- The earth lead (12)
- The mounting lug (13)
Lower the vehicle close to ground-level.
Unplug:
- The air temperature sensor (17)
- The connector (20)
Remove:
- The air filter (18) box
- The air sleeves (16)
Uncouple:
- The oil vapour recycling tube
- The pipe (15)
Remove:
- The 2 retaining lugs (19)
- The cooling radiator
Unplug:
- The engine harness
- The positive harness (at "b")
Remove:
- The bracket fixing screws (at "c" and "d")
- The coolant header tank fixing screw
- The water reservoir (14)
CAUTION: Do not distort the selection lever (8) or the multifunction switch (9).
Uncouple the ball-joint (21) using the tool [5].
Uncouple the selection lever by pulling the pin (22) rearwards.
Disconnect the automatic gearbox ECU connector by moving the red tab.
Remove the fixing screws securing the coolant pipe on the automatic gearbox.
Detach the cables.
Uncouple the heater matrix hoses (26).
Place the tool [2] on the valve (23) to drop the pressure of the fuel supply circuit.
Collect the fuel in a container.
Uncouple:
- The fuel pipes (24)
- The vacuum tube on the chamber (25)
Fit a hose clamp [4] to the suction tube of the power steering pump.
Uncouple and close:
- The suction tube (28) of the power steering pump Using tools [3] and [7]
- The link tube (27) between the power steering pump and the rotary valve Using a pipe spanner
Position the vehicle at a height of 60 cm.
Centralise the lifting table 5 under the engine/gearbox assembly.
Remove the handle "e" to finish positioning the lifting bench [5].
Bring the threaded rod from support [6] at "f".
Position then tighten the brackets [6] on the platform of the tool [5].
Remove:
- The screws (32) and (33)
- The screws (29) and (30)
- The reaction link (31)
- The nut (35)
- The right-hand engine mounting (34)
Remove the fixing screws (36) and (37) from the bracket (38).
Gently lower the engine-gearbox assembly with the lifting bench.
N.B.: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Raise the vehicle.
N.B.: At "g", mark the location of the lifting bench on the floor.
Refit the handle "e" to the lifting bench.
3. Refitting
Raise the vehicle.
Position the lifting bench [5] at the reference points "g".
Remove the handle "e" to finish positioning the lifting bench [5].
Position the vehicle at a height of 60 cm.
Lift the elevating platform [5].
N.B.: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Engage the fixing screws (36) and (37) in the bracket (38).
automatic gearbox:
- Tighten the bolts (36) to 4,5 ± 0,5 daN.m
- Tighten the bolt (37) to 4,5 ± 0,5 daN.m
Refit the support (34).
Tighten the nut (35) to 4,5 ± 0,5 daN.m.
Engage the fixing screws (32) and (33) in the bracket (34).
Tighten the screws (32) and (33) to 6 ± 0,6 daNm.
Refit:
- The reaction link (31)
- The screws (29) and (30) Tighten to 6 ± 0,5 daN.m
Lower lifting table [5].
Raise the vehicle.
Take away the lifting table [5].
Lower the vehicle close to ground-level.
Couple up:
- The suction tube (28) of the power steering pump Tighten to 2,5 ± 0,6 daN.m
- The link tube (27) between the power steering pump and the rotary valve Using tool [4]
Refit the power steering circuit fixing points.
Connect the connector (20).
Couple the heater matrix hoses (26).
Connect the gearbox connector.
Refit the cooling system supply tank (14).
Couple up:
- The vacuum tube on the chamber (25)
- The fuel pipes (24)
- The pipe (15)
Connect:
- The positive harness (at "b")
- The engine harness
Couple the oil vapour recycling tube.
Refit:
- The cooling radiator
- The 2 retaining lugs (19)
Couple the cooling radiator top hose.
Refit:
- The air hose (16)
- The air filter (18) box
Retighten the collar on the air duct.
Reconnect the air temperature sensor (17).
Raise the vehicle.
Couple up:
- The pipe (9)
- The heat exchanger hose (automatic gearbox)
- The pipe (11)
Unclamp the air conditioning compressor.
Refit:
- The air-conditioning compressor Tighten the bolts (10) to 3,9 ± 0,9 daN.m
- The power steering pump pulley
- The accessories drive belt (see the relevant operation)
Connect the air conditioning compressor connector.
Refit:
- The power steering pipe fixing clips
- The pre-catalytic converter (5) (fitted with its gasket) Tighten to 3,3 ± 0,5 daN.m
- The bracket (7) Tighten to 2,1 ± 0,3 daN.m
- The clip (8) Tighten to 2,5 ± 0,4 daN.m
- The exhaust/pre-catalyst manifold link bracket Tighten the 5 nuts to 3,3 ± 0,5 daN.m
Reconnect the connector (6).
Refit:
- The earth lead (12)
- The engine subframe (see the relevant operation)
- The drive shafts (see the relevant operation)
- The front splash shields (see the relevant operation)
- The front wheels Tighten to 9 ± 1 daN.m
Refill and top up the cooling circuit (see the relevant operation).
Reconnect the battery positive and negative terminals.
Top up the engine oil.
Refit the covers (1), (2), (3) and (4).
Carry out an initialisation of the ignition injection ECU (see the relevant operation).
engine running:
- Turn the steering slowly from lock to lock in each direction
- Check that the air-conditioning is working correctly
Anti-lock braking system:
- Switch on the ignition
- When the warning lamp goes out at the end of 3 seconds, it signals normal operation
- Road test
- Perform a reading of the autodiagnostic memory
Parts & tools for this job For 2004 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2004 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.