Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Locking, alarm and airbags21 Heating, air conditioning and audio
Citroën Jumper II Factory Workshop Manual (2002-2006)01 · Engine
01 · Engine

Checking: Pressure, engine end of compression

Make
Citroën
Model
Jumper II Factory Workshop Manual
Year
2002–2006
Section
Engine assembly › Checking: Pressure, engine end of compression
EngineChecking: Pressure, engine end of compression

Checking: Pressure, engine end of compression

Citroën Jumper II · Checks · Ref. B1BD011NP0

Applies to: 2.3 td (sofim EURO5) or 2.3 td (sofim)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

Equipment:

  • Compression tester (Type FACOM)
  • Degreasing product (Type SODIMAC N°35)
  • Brush
  • Cleaning tray
  • Vacuum extractor
  • Round end-piece
toolReferenceDesignation
Figure e5ab0slt
[0188-U1]Hose
Figure e5ab0smt
[0188-U3]adaptor
Figure e5ab0snt
[0191-2C]Dummy plug for taking compressions
Figure e5ab06it
[0188-T]Set of plugs

2. Preliminary operations

Ensure that the speed of engine rotation, driven by the starter, is correct (Minimal value: 250 rpm).

Check:

  • The vehicle’s engine oil level
  • The condition of the air filter

3. Removing

CAUTION: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

CAUTION: Operations prohibited on HDi direct injection systems.

N.B.: Checking is carried out with the engine cold.

Disconnect the battery.

CAUTION: The priming pump has to be deactivated during compression take-off phases.

Remove the cover of the engine compartment fusebox.

Remove the priming pump protection fuse.

Figure b1bd04yd

Remove and move aside the power steering fluid reservoir (1) and its support (2).

Remove:

  • The pipe (3)
  • The pipe (4)
Figure b1bd051d

Unplug: The connector of the fuel flow regulator   (at "a").

CAUTION: When removing the oil filter (5), collect the oil using a clean receptacle.

Remove the oil filter (5).

N.B.: For compression take-offs, it is necessary to refit the oil filter (5).

CAUTION: It is necessary to remove the fuel high pressure supply pipe between the high pressure pump and the injection rail.

Figure b1bd054d

CAUTION: When uncoupling the fuel flow regulator (6) from the injection pump, plug the openings; Using tool [0188-T].

Remove:

  • The 3 bolts (7)
  • The injection pump fuel flow regulator (6)

N.B.: Clean the fuel flow regulator if necessary.

Figure b1bd057d

CAUTION: When uncoupling the high pressure fuel supply pipe (9), blank the openings using tool [0188-T].

Loosen the union (8).

N.B.: Apply a counter-torque   (at "b").

Loosen the union (10).

Remove:

  • The (12) bolt
  • The bracket (11)
  • The fuel high pressure supply pipe (9)

N.B.: Save the silentblock on the fuel high pressure supply pipe (9).

Figure b1bd05ad

Disconnect the connectors   (at "c").

Move aside the electrical harnesses (13) and (14).

Figure b1bd05dd

Remove the glow plugs (15) (Cylinder by cylinder).

4. Measuring the pressures at the end of compression

Figure b1bd05gd

Position the tool [0191-2C] on the cylinder head and on cylinder n°1.

Connect:

  • The tool [0191-2C] with the tool [0188-U1]
  • The tool [0188-U1] with the tool [0188-U3]
  • The compressiometer with the tool [0188-U3]

Reconnect the battery.

Operate the starter for 10 seconds.

Note down the value of the pressure in cylinder N° 1.

Apply the same method for cylinders no.2, no.3 and no.4; Using the tools [0188-U3], [0188-U1], [0191-2C] and the compression gauge.

N.B.: The maximum discrepancy between 2 cylinders should be 5 bars.

CAUTION: If the pressure values are low, check the condition of the air filter and the head gasket before planning an engine overhaul.

5. Refitting

5.1. Preparation

Figure b1bd05jd

CAUTION: Systematically replace the O-ring seals (16) on the fuel flow regulator (6) with new O-ring seals priorly lubricated.

Position the new O-rings (16).

5.2. Refitting   (continued)

CAUTION: Adhere to the tightening torques.

CAUTION: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Disconnect the battery.

Remove:

  • The compression gauge
  • The tool [0188-U3]
  • The tool [0188-U1]
  • The tool [0191-2C]

Refit the pre-heater plugs (15).

Connect the connectors   (at "c").

Position: The wiring harnesses (13) and (14).

Refit:

  • The fuel high pressure supply pipe (9)
  • The bracket (11)
  • The bolt (12)

Pre-tighten the unions (8) (10)   (by hand).

Tighten unions (8) and (10).

N.B.: Apply a counter-torque   (at "b").

Refit:

  • The injection pump fuel flow regulator (6)
  • The 3 bolts (7)
  • The oil filter (5)   (new)

Connect the connector of the fuel flow regulator   (at "a").

Refit:

  • The pipe (4)
  • The pipe (3)
  • The power steering fluid reservoir (1) and its support (2)
  • The priming pump protection fuse
  • The cover of the engine compartment fusebox

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

Clear the faults in the memory; Using the diagnostic equipment.

Parts & tools for this job For 2002 Citroën Jumper

As an Amazon Associate we earn from qualifying purchases.