Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Locking, alarm and airbags21 Heating, air conditioning and audio
Citroën Jumper II Factory Workshop Manual (2002-2006)01 · Engine
01 · Engine

Removing - refitting: Engine/gearbox assembly (SOFIM)

Make
Citroën
Model
Jumper II Factory Workshop Manual
Year
2002–2006
Section
Engine assembly › Removing - refitting: Engine/gearbox assembly (SOFIM)
EngineRemoving - refitting: Engine/gearbox assembly (SOFIM)

Removing - refitting: Engine/gearbox assembly (SOFIM)

Citroën Jumper II · Removal-fitting · Ref. B1BG58P0

Applies to: 2.8 HDi 146 (sofim) or 2.8 HDi (sofim) from date 01/00/1700

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure b1bp030c
ReferenceDesignationReferenceReference
[1][/] bonnet securing catch5706-T(-).1331
Figure e5-p12cc
ReferenceDesignationReferenceReference
[2][/] hub immobilising tool6310-T(-).0606.AY
Figure e5-p07jc
ReferenceDesignationReferenceReference
[3][] pliers for removing the plastic pegs7504-T(-).1311
Figure e5ap1gvc
ReferenceDesignationReferenceReference
[4a][] engine support with reversible tool5704-T(-).0005
[4b][/] engine supports5704-T(-).0005
Figure e5ap1gwc
ReferenceDesignationReferenceReference
[5][/] lifting bench5702-T.A(-).0004
Figure e5ap17wc
ReferenceDesignationReferenceReference
[6][/] plugs kit(-).0188.T(-).0188.T

2. Removing

Disconnect the battery.

Lift and support the vehicle.

Figure b1bp035c

Set the bonnet vertically by means of tool [1].

Drain:

  • The cooling system (see the relevant operation)
  • The gearbox
  • Power assisted steering reservoir

Remove:

  • The front wheels
  • The protection plates under the engine (if fitted)
Figure b1bp2qcd

Remove:

  • The bolts (4)
  • The front section trim
  • Power assisted steering reservoir bracket (1)
  • The air filter sleeve (2)
  • The fuse and relay box (3)
Figure c4ap174c

Remove the front mud shields (5), Using tool [3].

Figure c4ap175c

Remove tie-rods (6) from the bumper.

Figure c4ap176c

Remove:

  • The (8) bolt
  • The nut (7)

Disconnect and remove the headlamp units.

Figure c4ap177d

Remove:

  • The 9 bolts (9)
  • The bumper
  • Bonnet locking
  • Front panel
Figure b1bp2qdd

Remove:

  • The style cover
  • The air cleaner (11)
  • The unions on the air filter (11)
  • The expansion bottle (10)

Uncouple the hoses from the radiator.

Disconnect the electric harnesses.

Figure c5hp193d

Uncouple the cooling fan connectors.

Vehicle with air conditioning:

  • Remove the bolts (12)
  • Protect the capacitor
  • Move aside the condenser

Remove:

  • The fixings from the electric harnesses on the fan unit
  • The cooling radiator
  • The heat exchanger
  • The fixings from the abs hydraulic block (according to equipment)
  • Lower crossmember screws (13)
  • The lower crossmember
Figure b1bp2e2d

Disconnect:

  • The starter motor earth (19)
  • The starter motor earth (18)
  • The coolant temperature sensor connectors
  • The air conditioning compressor electrical supply
  • The reversing lamp connector
  • The ABS connectors (according to equipment)
  • The connector (17)

Uncouple:

  • The hoses (14) and (15)
  • The fuel supply and return on the fuel high pressure pump
  • The clutch cable (16)
  • The earth cable (24)
  • The braking servo pipe (23)

Remove the bolts (21).

Hang the air conditioning compressor (20) from the vehicle body.

Remove the fixing of the link tube between the power steering pump and the rotary valve.

Uncouple and close Using tool [6] The link tube (22) between the power steering pump and the rotary valve.

Remove the drive shafts (see the relevant operation).

Figure b2cp3fec

Uncouple:

  • The gearchange ball-joints
  • All the gear controls (25) on the gearbox

Disconnect:

  • The speedometer cable
  • The alternator electrical harness
  • The oil pressure switch
Figure b1bp22kc

Remove:

  • The reaction link (26)
  • The bolts from the exhaust
Figure b1bp22lc

Put support [4a] into place in the RH driveshaft bearing.

Figure e5ap1gxc

Put lifting table [5] together with its supports [4b] in position under the engine.

Figure b1bp22mc

Draw lifting table [5] in and secure support [4a].

Figure b1bp22nc

Bring the threaded rod from support [4b] at "a".

N.B.: Position and tighten supports [4a] and [4b] on tool plate [5].

Figure b1bp2e3d

Remove the 4 bolts (29).

Remove the nut (28) and the washer.

Remove the bolts (27).

Remove the power unit from the front.

3. Refitting

Place the power unit on the lifting table [5].

Refit:

  • The bolts (27)
  • Nut (28) and washer
  • The 4 bolts (29)

Tightening torque:

  • Tighten the bolts (27) to 8 ± 0,8 m.daN
  • Tighten the nut (28) to 8 ± 0,8 m.daN
  • Tighten the 4 bolts (29) to 8 ± 0,8 m.daN
Figure b1bp2e4c

Remove bolts (32).

Lower lifting table [5].

Remove:

  • The (30) bolt
  • The bracket [4a]
  • The pad (31)

Refit:

  • The reaction link (refer to the Note)
  • The bolts from the exhaust, Tighten to 1 ± 0,1 daN.m
  • The speedometer cable

N.B.: Gearbox end: Tighten to 9 ± 0,9 daN.m. Cradle side: Tighten to 5 ± 0,5 daN.m.

Reconnect:

  • The alternator electrical harness
  • The oil pressure switch

Couple up:

  • All the gear controls (25) on the gearbox
  • The gearchange ball-joints

Refit the drive shafts (see the relevant operation).

Figure b1bp2e2d

Remove the blank [6] from the link tube (22) between the power steering pump and the rotary valve.

Refit:

  • The fixing of the link tube between the power steering pump and the rotary valve
  • The air conditioning compressor (20)
  • The bolts (21)

Couple up:

  • The hoses (14) and (15)
  • The braking servo pipe (23)
  • The earth cable (24)
  • The clutch cable (16)
  • The fuel supply and return on the fuel high pressure pump

Reconnect:

  • The connector (17)
  • The ABS connectors (according to equipment)
  • The reversing lamp connector
  • The air conditioning compressor electrical supply
  • The coolant temperature sensor connectors
  • The starter motor earth (18)
  • The starter motor earth (19)

Refit:

  • The lower crossmember
  • Lower crossmember screws (11)
  • The fixings from the abs hydraulic block (according to equipment)
  • The cooling fan unit
  • The radiator hoses
  • The (10) bolt
  • Front panel

Vehicle with air conditioning:

  • Refit the condenser
  • Refit the bolts (12)

Refit:

  • The expansion bottle (5)
  • Bonnet locking
  • The air cleaner (11)
  • The style cover
  • The bumper
  • Bumper tie-rods (6)

Connect and refit the headlamp units.

Refit:

  • The (8) bolt
  • The nut (7)
  • The front section trim
  • The bolts (4)
  • Power assisted steering reservoir bracket (1)
  • The air filter sleeve (2)
  • The fuse and relay box (3)
  • The front splash shields (5)
  • The protection plates under the engine (if fitted)
  • The front wheels

Fill and top up the level of the following of the following elements:

  • Gearbox
  • Power steering reservoir
  • Cooling system (see the relevant operation)

Start the engine.

Operate the steering slowly from lock to lock to bleed the ram.

Top up the level if necessary.

Remove the tool [1].

Return the vehicle to its wheels.

Parts & tools for this job For 2002 Citroën Jumper

As an Amazon Associate we earn from qualifying purchases.