Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Locking, alarm and airbags21 Heating, air conditioning and audio
Citroën Jumper II Factory Workshop Manual (2002-2006)01 · Engine
01 · Engine

Re-pressurising: CNG supply circuit

Make
Citroën
Model
Jumper II Factory Workshop Manual
Year
2002–2006
Section
Engine assembly › Re-pressurising: CNG supply circuit
EngineRe-pressurising: CNG supply circuit

Re-pressurising: CNG supply circuit

Citroën Jumper II · Draining - filling - bleeding · Ref. B1HI0CP0

Applies to: NVG dual fuel and 2.0 i from date 01/00/1700

CAUTION: A gas leak may occur in the natural gas supply circuit at low pressure and disappear at high pressure and vice versa. Therefore, it is necessary to check for leaks at different pressures.

ESSENTIAL: Never re-tighten or unscrew connectors under pressure.

N.B.: Before refitting the components, check that no foreign body has entered the ducts or is on the mesh of the connectors.

1. Recommended tools

Figure e5ap08ec

[1] leak detector FRAMET DF9.

2. Re-pressurising

Close the natural gas supply circuit again and re-tighten the connectors.

Figure b1hp1n2d

N.B.: Close the manual safety valves at "a" located on the CNG tanks.

2.1. Stage 1

Spray the product from tool [1] onto the previously removed unions (failing that, use soapy water).

Open then rapidly close one CNG tank manual safety valve at "a".

Run the engine in natural gas mode until it changes to petrol mode.

Stop the engine.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

2.2. Stage 2

Spray the product from tool [1] onto the previously removed unions (failing that, use soapy water).

Open then rapidly close one CNG tank manual safety valve at "a".

Run the engine in CNG mode until the pressure reaches around 50 ± 10 bars.

Stop the engine.

N.B.: To obtain this pressure, connect the diagnostic tool to the vehicle then read the pressure in the CNG circuit Close a manual safety valve at "a" when the value of 50 bars is reached.

Without diagnostic equipment (see the relevant operation).

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

Achieving a defined pressure.

Figure b1hp1n5c

N.B.: The electrical check is carried out using a shunt (2) to be placed between the CNG pressure sensor (1) and its connector (3). The output signal is registered using a multimeter on the terminal "b".

Figure d6ap01sc

V: Voltage (V).

P: Pressure (bars).

The table indicates the relation between the pressure and the output voltage: 1 V for 50 bar.

2.3. Stage 3

Open the 3 CNG tank manual safety valves at "a".

Run the engine in CNG mode until the pressure reaches around 100 bars.

N.B.: To obtain this pressure, connect the diagnostic tool to the vehicle then read the pressure in the CNG circuit.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

CAUTION: Wait a few minutes, then perform a new check Using tool [1].

2.4. Stage 4

N.B.: This stage must be carried out at a pressure of 200 bars, therefore the CNG tanks must be filled to maximum capacity. If this is not the case, top up at the closest natural gas station.

Open the 3 CNG tank manual safety valves at "a".

Run the engine in natural gas mode.

Check for any leaks at the CNG unions (presence of bubbles) using tool [1], or soapy water.

ESSENTIAL: Should there be a leak of gas at the union, carry out a partial draining of the CNG system Retighten the union, then restart the operations to re-pressurise the CNG supply circuit.

After an idle phase of at least 3 hours, carry out a final detection of leaks before supplying to the customer.

3. Additional operations

After using a surface-active agent (leak detector or soapy water) on a union, the unions must be rinsed with clean water and dried using compressed air Risk of corrosion.

Parts & tools for this job For 2002 Citroën Jumper

As an Amazon Associate we earn from qualifying purchases.