Engine re-assembly: PUMA 2.2
- Make
- Citroën
- Model
- Jumper III Factory Workshop Manual
- Year
- 2006–2017
- Section
- Engine assembly › Engine re-assembly: PUMA 2.2
Engine re-assembly: PUMA 2.2
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Tooling
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [1] | pipe spanner | 4220-T.D (4220-T kit) | (-).1603-G ((-).1603 kit) |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [2] | [] tool for refitting clutches with double damping flywheel | (-).0217 | (-).0217 |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [3] | Torque wrench | (-).4220-T.B (4220-T kit) | (-).1603-A ((-).1603) kit |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [4] | Torque wrench (1 to 5 dan.m) | (-).1608-A ((-).1608) kit | (-).1608-A ((-).1608) kit |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [5] | Adaptor for tightening diesel injector | (-).1608-C ((-).1608 kit) | (-).1608-C ((-).1608 kit) |
2. Check - Cleaning
CAUTION: Do not refit the engine without having inspected and cleaned its principal components, or there will be serious damage.
Check - Clean:
- The clutch mechanism (Wear)
- The exhaust gas recirculation valve (Soots, foreign bodies)
- The exhaust gas recycling pipes (Soots, foreign bodies)
- The turbocharger (Soots, foreign bodies)
- The turbocharger air unions (Foreign bodies)
- The exhaust manifold (Foreign bodies)
- The inlet manifold (Foreign bodies)
- The lubrication circuit (Particulates)
3. Re-assembling
3.1. New clutch mechanism
Refit the clutch disc (1).
Centre the clutch disc (1) using the centring device at "a" of the tool [2].
Refit the clutch mechanism (2).
Fit the plate "b" of the tool [2].
Bring the 3 screws "d" of tool [2] in contact with the clutch mechanism (2).
Bring the clutch mechanism in contact with the engine flywheel, using the lever "c" of tool [2].
Fit 3 screws to secure the clutch mechanism.
Bring the 3 screws into contact with the clutch plate (2).
Remove the tool [2].
Fit 3 more screws to fix the clutch mechanism (2).
Bring the 3 screws into contact with the clutch plate (2).
Tighten the 6 clutch mechanism fixing bolts (2) to 2,9 daN.m.
3.2. Clutch mechanism re-used
Resetting of the clutch wear adjustment to zero.
CAUTION: The clearance adjustment takes place without the clutch disc.
Fit the plate "b" of the tool [2] on the clutch mechanism (2).
Bring the 3 screws "d" of tool [2] in contact with the clutch mechanism (2).
Release the wear adjustment system by tightening the clutch mechanism slightly (2); Using the lever "c" of tool [2].
Compress the springs (3); By means of a screwdriver.
CAUTION: Without releasing the pressure on the springs (3), slacken the clutch mechanism (2); The springs (3) must remain compressed.
Remove the tool [2].
Refit the clutch (follow the procedure "new clutch mechanism").
3.3. Flywheel side
Refit the new seals (4), (5).
Refit the vacuum pump (6) and coolant outlet housing assembly; Tightening to 2,3 m.daN.
Refit:
- The high pressure fuel pump drive dog 7
- The spacer (8)
- The bolts (9); Tightening to 2,3 m.daN
Refit:
- The fuel high pressure pump (10)
- The bolts (11); Tightening to 2,3 m.daN
- The lifting eye
Refit:
- The engine speed sensor (12)
- The (13) bolt
Set the engine speed sensor (12) air gap to 1,2 mm.
Tighten the bolt (13) to 0,7 daN.m.
3.4. Timing gear side
Refit:
- The notched guide roller (14)
- The (15) bolt
- The engine mounting (17)
- The stud and nut assembly (18)
- The bolts (16)
- The smooth guide roller (21)
- The pulley (19)
- The bolts (20)
Tighten:
- The screw (15) to 2,3 m.daN
- The assembly (18) (Stud: 4,8 daNm - nut: 2,3 daNm)
- The bolts (16) to 8 da.Nm
- The bolts (20) to 4,5 da.Nm; Finish with an angular tightening of 120 °
3.5. Injection system
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
CAUTION: Replace the removed diesel injection high pressure pipe(s).
CAUTION: Refit the diesel injectors observing the marks made on removal (if the injectors are to be reused).
Remove the closers.
Refit:
- The injectors (21) with the clips (22)
- The bolts (23) (new) (without tightening them)
- The fuel high pressure common rail (26)
- The bolts (27) (without tightening)
- The new high pressure fuel pipe (25)
- The bracket (24) (without tightening)
Fully hand-tighten the unions of the fuel high pressure pipe (25).
Fit the new high pressure fuel pipes (28).
Do up fully by hand the unions of the fuel high pressure supply pipes (28).
Tighten:
- The bolts (23) to 0,6 da.Nm; Using tool [4]; Finish with an angular tightening of 120 °; Using tool [5]
- The bolts (27) to 2,5 da.Nm
Method for tightening the unions (25), (28) using the tools [3] and [1]:
- Pre-tighten to 2,3 daNm
- Tightening to 3,5 m.daN
Tighten the fixing bracket screw (24), to 1,1 m.daN.
3.6. Oil filter side
Refit:
- The pre-heat plugs electrical harness (29)
- The dipstick guide (30) (without tightening)
- The oil filter and oil cooler assembly (33)
- The cooling system pipe (32) (without tightening)
- The power steering pump and coolant pump assembly (34)
- The alternator (35)
- The inlet manifold (31)
Tighten:
- The fixings of the assembly (33): 2,3 daNm
- The fixings of the assembly (34): 2,2 daNm
- The mountings (Air inlet manifold (31)): 1,6 daNm
- The cooling system pipe (32) fixings: 2,3 daNm
- The dipstick guide (30) fixing on the engine block: 2,3 daNm
- The bolts of the oil dipstick guide (30) on the air inlet manifold (31): 0,4 daNm
- Tighten the alternator (35) fixings: 4,1 daNm
Refit:
- The fuel return pipe (36)
- The cooling system pipe (38)
- The exhaust gas recycling electrovalve and heat exchanger assembly (37)
Tighten the fixings of the pipe (38) to 1 m.daN.
3.7. Exhaust side
CAUTION: Always replace the turbocharger oil supply pipe as well as its seals.
Refit:
- The lifting eye (40)
- The turbocharger and exhaust manifold assembly (41)
- The exhaust manifold (41) fixings
- The turbocharger lubrication return pipe
- The banjo bolts (44)
- The (42) bolt
- The turbocharger oil return pipe (43)
Tighten:
- The lifting eye (40) fixings: 2,3 daNm
- The banjo bolts (44): 3,5 daNm
- The (42) bolt: 2,3 daNm
- The oil return pipe (43) fixings: 1 daNm
- The bolts (39): 2,3 daNm
3.8. Exhaust manifold
CAUTION: Respect the tightening sequence indicated (order from 1 to 8).
Tighten:
- The fixing bolts to 4 daN.m
- The nuts to 4 m.daN
Refit the engine electrical harness.
Parts & tools for this job For 2006 Citroën Jumper
- PARTEngine gasket setSearch: Citroën Jumper 2006 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.