Sequence of operations
- Make
- Fiat
- Model
- Punto (176) Factory Service Manual
- Year
- 1993–1999
- Section
- Sunroof › Sequence of operations
70 BodyworkSequence of operations
Sequence of operations
Before fitting the sunroof operating motor to the vehicle, the following checks need to be carried out:
- On the motor, check that the microswitch pin is positioned in the recess in the cam, as illustrated in the bottom insert;
- if the microswitch is not in the above-mentioned position, the cam should be rotated, using the special key as described on page 157, until it is brought to the correct position;
NOTE The motor is supplied as a spare part in a suitable position for correct fitting with the sunroof in the "spoiler" position (fully raised).
- check that the sunroof is in the "spoiler" position before refitting the motor to the vehicle.
Components of the sunroof
- Top right guide
- Sliding blind
- Sunroof glass seal
- Sunroof glass
- Frame seal
- Sunroof frame
- Rear pipe for discharging leaks
- Top left guide
- Bottom left moving guide
- Trim piece
- Front pipe for discharging leaks
- Electric motor
- Moving deflector
- Bottom right moving guide
Parts & tools for this job For 1993 Fiat Punto
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Fiat Punto
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.