Pre-delivery inspection (PDI) (page 2 of 3)
- Make
- Land Rover
- Model
- Range Rover L322 Range Rover Pre-Delivery Inspection Manual
CPre-delivery inspection (PDI) · page 2 of 3
- Check security of battery carrier clamps and positive battery terminal. Using a volt meter, ensure battery voltage exceeds 12.5 volts before connecting Testbook/T4. If voltage is below this figure recharge battery. NOTE: The voltage check must be carried out before connecting Testbook/T4. Failure to do this may result in vehicle configuration failure.
- If BBUS multiplug is disconnected, remove nut securing sounder to support bracket.
- Connect multiplug to BBUS.
- Fit nut to BBUS and tighten to 10 Nm (7 lbf.ft).
- Visually check brake fluid level is at the 'MAX' mark on brake reservoir. Investigate the cause if brake fluid level is low.
- Remove filler cap, check and top up windscreen, headlamp and rear washer reservoir with diluted Land Rover screen wash fluid. Refit the cap.
- Connect earth lead to negative battery terminal and tighten bolt to 10 Nm (7 lbf.ft).
Parts & tools for this job For Land Rover Range Rover
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Land Rover Range Rover
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.