Workshop Manuals Factory service & repair Peugeot
01 Wheels and tyres02 Petrol engines (XM7-T, XN1-T, XN1-TA)03 Diesel engines (U25/651, U25/661, U25/673, XUD9A)04 Clutch05 Gearbox06 Propeller shafts, drive shafts and viscous coupling07 Front axle08 Rear axle and 4 x 4 differential09 Steering10 Suspension11 Brakes12 Electrical equipment
Peugeot J5 Factory Workshop Manual (1982-1994)05 · Gearbox
05 · Transmission

Preparing the housings

Make
Peugeot
Model
J5 Factory Workshop Manual
Year
1982–1994
Section
Overhauling the gearbox › Preparing the housings
GearboxPreparing the housings

Remove the shift fork shafts and shift forks, Figs. I and II

  • Remove :
    • - bolts (5) and (6),
    • - shafts (1) and (2) their forks : shaft (2) has a locking plunger on it.

Place the reverse shift control in the reverse position, Fig. II.

Remove, Fig. II.

  • - shaft (7) and the reverse gear,
  • - shaft (9) and the control components. (Warning - there is a ball and a spring at (a)),
  • - bolt (8), and take out the bracket.

Remove, Fig. I : the input shaft (4) and the output shaft (3), together.

Take out : Fig. III.

  • : the locking plungers, from points (b), using a magnet.

Remove the crown wheel carrier : Fig. III and IV.

  • Remove :
    • - the bearing retainer plates (10),
    • - the final drive casing (11).

Remove the crown sheet carrier : Fig. IV.

If the bearings are to be reused, mark the positions of their outer track rings (12) and retain the adjusting shims that are fitted at (c).

PREPARING THE HOUSINGS

Prepare the clutch housing : Fig. V.

Replace seal (13), Oil its outer periphery and fit it, using the 36 mm i.d. x 42 mm o.d. tube.

Fit the assembly studs, when applicable, Figs. V and VI.

STUD
Ref.QtyØ in mmLength in mm
A18100
B1885
C2860
D4845
E2850
F1865
G31090
H4875
I110115

Check that the two locating dowels (→) are in position.

Parts & tools for this job For 1982 Peugeot J5

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.