Workshop Manuals Factory service & repair Skoda
01 Running gear02 Engine03 Body04 Drive unit05 Power transmission06 Vehicle electrics07 Heating, ventilation, air conditioning system08 Power unit09 Technical Data10 Self diagnosis, V.A.G Inspection Service11 Engine assy, cylinder block, crankcase12 Enginecrankshaft group, pistons13 Engine cylinder head, valve gear14 Engine lubrication15 Engine cooling16 Fuel supply, gas operation17 Exhaust turbocharger, G-charger18 Fuel preparation system Diesel injection19 Mixture preparation system, electronic inj., Gas20 Exhaust system21 Starter-current supply-CC22 Ignition system, glow plug system23 Clutch, control24 Torque converter25 Gearbox mechanics, operation, construction, diff.26 Gearbox, mechanics, gears, shafts, internal operation27 Automatic gearbox, control, assembly, housing28 Automatic gearbox, gears, control29 Final drive, differential, differential lock30 Front suspension, drive shafts31 Rear suspension, drive shaft32 Wheels, tyres. axle align33 ABS, ADR, TCS, EDL, ESP34 Brake, brake mechanics35 Brakes, hydraulics, regulator, servo36 Steering37 Body front38 Body centre, roof, frame39 Body, rear40 Sliding roof41 Exterior equipment42 Interior equipment43 Heating44 Air conditioner45 Infotainment46 Windscreen wipe/wash system47 Lights, lamps, switches outside48 Lights, lamps, switches inside, anti-theft system49 Wiring
Skoda Roomster43 · Heating
43 · Heating & A/C

Removing and installing heat exchanger

Make
Skoda
Model
Roomster
Section
Heating, Air conditioning › Removing and installing heat exchanger
HeatingRemoving and installing heat exchanger

Removing and installing heat exchanger

Heating, ventilation, air conditioning system · Heating, Air conditioning · Removing and installing parts of the heater unit - Part 1 · Roomster · Edition 11.2010

  • Hose clamps MP7-602 (3094)

Removing

Warning

The coolant temperature can be over 100 °C when the engine is warm. The cooling system is under pressure - risk of scalding!

Before repairs, reduce pressure and temperature if necessary.

Unscrew battery earth strap Electrical System Rep. gr. 27.

Remove the centre console Body Work Rep. gr. 68.

Reduce pressure in the coolant circuit by opening the cap on the coolant reservoir.

Use hose clamps MP 7-602 (3094)- to pinch off coolant hoses of heat exchanger (if not possible, drain coolant).

S80-0103

Place cleaning cloth below heat exchanger connection to collect drained coolant.

Detach coolant hoses (2) and (3).

Carefully blow coolant out of the heat exchanger with compressed air.

To do so connect up the hose with compressed air on the connection fitting for the feed and attach the container under the connection fittings for return flow.

Unscrew screw (arrow) (20 Nm) and lay connection fitting for heat exchanger (1) to the front.

For vehicles with heating element for additional air heating Z35

Separate plug connection of the auxiliary heating to the vehicle wiring loom on left or heater unit.

Unscrew nut (10 Nm) and unscrew the earth cable of the auxiliary heating under the distributor housing.

Continued for all vehicles

Remove connecting part for rear duct (3).

S80-0156

Lever off retaining clips (1) on right, on left and at rear.

Lower bottom part of distributor housing with heat exchanger (2) at the rear and pull out of the front catch towards the rear.

Carefully swivel out bottom part of distributor housing to the right (arrow).

Take heat exchanger out of the bottom part of distributor housing.

For vehicles with heating element for additional air heating Z35

Carefully remove heating element for additional air heating Z35 upwards from the bottom part of distributor housing.

Install

Installation is carried out in the reverse order. Pay attention to the following:

Moisten sealing lips of the gasket in bulkhead (assembly plate) - heat exchanger with a neutral soapy solution before installing the heat exchanger (easier mounting).

Carefully press gasket (1) in the bulkhead (assembly plate) from the outside into the groove of the connection fitting (2) of the heat exchanger (arrows).

S80-0111

Replace O-rings at connection fitting of heat exchanger.

Connect coolant hoses the right way round.

In direction of travel
on the left: Feed
on the right: Return flow

Note

  • If the heat exchanger is replaced, drain the entire coolant and fill system with fresh coolant.

Inspect coolant level, top up with coolant if necessary.

Pay attention to the sequence when connecting the battery earth strap Electrical System Rep. gr. 27.

Parts & tools for this job For Skoda Roomster

As an Amazon Associate we earn from qualifying purchases.